WELL · 42-155-30586 · DISTRICT 9

Johnson-Hammonds #1

N

Foard County · Thalia (Tannehill) field  · Vertical

Johnson-Hammonds #1 (API 42-155-30586) is a well in Foard County operated by Mid-Continental Exploration Inc., completed March 9, 1996.

The RRC has issued 3 drilling permits (amended twice) between 1996 and 2000, permitted to 1,999 ft.

Completion filings report 2 formation tops, including Wichita-Albany, Tannehill.

No lease production has been reported under this well’s leases.

Operator of record

Mid-Continental Exploration Inc.

Sanger, TX · P-5 Y, filed Feb 4, 2022 · 95 permits on file · (972) 571-0563

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMid-Continental Exploration Inc.
Production reportsBlackbrush O & G, LLCthrough May 2024
Latest permitMid-Continental Exploration,inc.Aug 3, 2000

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,999
total depth, ft
5
permits on file
Aug 3, 2000
last permit issued
Mar 9, 1996
completed
0
cumulative oil, bbl
162K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 1996 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 9, 1996
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Johnson-Hammonds East G-13-179368Thalia (Wichita Falls)Blackbrush O & G, LLC10105KAug 2000 – Jul 2026
Johnson-Hammonds G-13-158370Thalia (Tannehill)Mid-Continental Exploration,inc.1057KMar 1996 – Sep 2000

Gas, mcf lease total

Last 12 months 0 · prior 12 1(-100%)

012202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mid-Continental Exploration,inc.Mar 1996 → Sep 2002
  2. 2MB Exploration, LLCOct 2002 → Jul 2008
  3. 3Palmer Petroleum Inc.Mar 2003 → Nov 2006
  4. 4Blackbrush O & G, Inc.Aug 2008 → Apr 2012
  5. 5Blackbrush O & G, LLCMay 2012 → May 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
497865-99RecompletionMid-Continental Exploration,inc.Jul 31, 2000Aug 3, 2000Sep 5, 20001,560
480750-99Field transferMid-Continental Exploration,inc.Nov 10, 1998Nov 10, 1998Feb 24, 19961,560
444188-97DrillMid-Continental Exploration,inc.Jun 6, 1996Feb 8, 1996—1,999
444188-98DrillMid-Continental Exploration,inc.Feb 20, 1996Feb 8, 1996Feb 24, 19961,999
444188-99DrillMid-Continental Exploration,inc.Jan 29, 1996Feb 8, 1996—1,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-13-158370————
—— G-13-179368————

Formation tops

As filed on W-2/G-1. Subsea from 1,400 ft elevation.Download CSV →

FormationMD ftSubsea
Wichita-AlbanyWICHITA FALLS958442
Wichita-AlbanyWICHITA FALLS960440
Tannehill1,511-111

Perforations

Perforated and open-hole intervals.

FromToType
958974Perforated
982992Perforated
9941,002Perforated
1,5111,516Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62510712.2565 S
4.51,5497.875230 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 29, 2000Oct 6, 2000Yes
00Nov 9, 2000——
00Jan 28, 1999Mar 29, 1996—
00Jul 11, 1996Mar 29, 1996Yes
00Jul 5, 1996——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/15530586, documented in the API reference.