WELL · 42-155-30763 · DISTRICT 9

Anderson #4

Y

Foard County · Rasberry (Caddo 6100) field · Injection  · Vertical

Anderson #4 (API 42-155-30763) is a well in Foard County operated by Acierto Resources Company LLC, completed June 1, 2011 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued April 13, 2010, permitted to 6,600 ft.

It was permitted by Chisholm Operating, Inc. and has since transferred to Acierto Resources Company LLC on the wellbore schedule.

Completion filings report one formation top, including Caddo.

Its lease has reported 77.2K barrels of oil since January 2010, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 100K barrels injected in the 12 months reported through February 2026.

Operator of record

Acierto Resources Company LLC

Permitted by Chisholm Operating, Inc.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Feb 4, 2026 · (281) 468-4344

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAcierto Resources Company LLC
Production reportsAcierto Resources Company, LLCthrough Apr 2026
Latest permitChisholm Operating, Inc.Apr 13, 2010

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,600
total depth, ft
1
permits on file
Apr 13, 2010
last permit issued
Jun 1, 2011
completed
77.2K
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 2010 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 1, 2011
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Anderson O-13-31510Rasberry (Caddo 6100)Acierto Resources Company, LLC377.2K0Jan 2010 – Jul 2026

Oil, barrels lease total

Last 12 months 1,498 · prior 12 1,413(+6%)

0100200202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chisholm Operating, Inc.Jan 2010 → May 2019
  2. 2Acierto Resources Company, LLCJun 2019 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
694028-99DrillChisholm Operating, Inc.Apr 7, 2010Apr 13, 2010May 12, 20106,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-31510————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Caddo6,015

Perforations

Perforated and open-hole intervals.

FromToType
3,8323,846Perforated
3,8723,882Perforated
3,8963,906Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62516012.25150 S
5.54,1127.875300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 12, 2017Jun 5, 2015—
00Feb 24, 2017——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

100K
bbl, last 12 reported months
884K
bbl, all reported
Feb 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000102861W-14 DisposalActive1,0001,7003,830–3,910

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 100,372 · prior 12 96,961(+4%)

05K10K15K20252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/15530763, documented in the API reference.