WELL · 42-157-30087 · DISTRICT 3

Sliva W. J. #6

N

Fort Bend County · Barb-Mag (FB-2 EY-3) field  · Vertical

Sliva W. J. #6 (API 42-157-30087) is a well in Fort Bend County operated by Silverbrook Operating LLC, completed May 15, 1971.

The RRC has issued 2 drilling permits between 1988 and 1996, permitted to 8,500 ft.

It was permitted by Gardner Energy Corporation and has since transferred to Silverbrook Operating LLC on the wellbore schedule.

Completion filings report one formation top, including Yegua.

Its 2 leases have reported 59.8K barrels of oil and 88.4K mcf of gas since January 1993, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

Silverbrook Operating LLC

Permitted by Gardner Energy Corporation; the EWA schedule now lists a different operator.

Barker, TX · P-5 Y, filed Jul 4, 2026 · (713) 410-2385

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSilverbrook Operating LLC
Production reportsSilverbrook Operating, LLCthrough Sep 2025
Latest permitGardner Energy CorporationMar 27, 1996

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,500
total depth, ft
2
permits on file
Mar 27, 1996
last permit issued
May 15, 1971
completed
59.8K
cumulative oil, bbl
88.4K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 15, 1971
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Sliva, W. J. O-3-5140Barb-Mag (FB-5, EY-4)Silverbrook Operating, LLC259.8K27.2KJan 1993 – Jul 2026
Sliva, W. J. G-3-128978Barb-Mag (EY-1)Gardner Energy Corporation1061.2KJan 1993 – Jul 1995

Oil, barrels lease total

Last 12 months 514 · prior 12 1,783(-71%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Gardner Energy CorporationJan 1993 → Apr 1998
  2. 2Gec Operating, Inc.May 1998 → Aug 2014
  3. 3Five-Jab, Inc.Sep 2014 → Jul 2017
  4. 4Silverbrook Operating, LLCMar 2023 → Sep 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
438988-99RecompletionGardner Energy CorporationAug 16, 1995Mar 27, 1996Jul 5, 19958,500
348586-99RecompletionTexaco Inc.Jul 6, 1988Aug 2, 1988—8,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-128978————
—— O-3-5140————

Formation tops

As filed on W-2/G-1. Subsea from 133 ft elevation.Download CSV →

FormationMD ftSubsea
Yegua7,920-7,787

Perforations

Perforated and open-hole intervals.

FromToType
7,9227,938Perforated
8,1528,161Perforated
8,1788,185Perforated
8,1888,195Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,281151,025 S
5.58,4999.875425 S
5.58,5009.875425 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 30, 1997Oct 2, 1995Yes
00Apr 28, 1997——
00Jan 4, 1989Oct 24, 1988Yes
00Dec 2, 1988——
00Jan 12, 1984May 20, 1971—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/15730087, documented in the API reference.