WELL · 42-157-31695 · DISTRICT 3
Talley Lee A #1
Fort Bend County · Orchard North (Wilcox) field · Temp Abandoned · Vertical
Talley Lee A #1 (API 42-157-31695) is a well in Fort Bend County operated by Proline Energy Resources Inc, completed January 20, 1987 and listed as temp abandoned on the RRC schedule.
The RRC has issued one drilling permit, issued April 1, 1986, permitted to 14,500 ft.
It was permitted by Southeastern Pipe Line CO. and has since transferred to Proline Energy Resources Inc on the wellbore schedule.
Completion filings report 3 formation tops, including Frio, Yegua, Wilcox.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Southeastern Pipe Line Co.; the EWA schedule now lists a different operator.
Sugar Land, TX · P-5 Y, filed Jul 4, 2026 · (832) 930-4455
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Proline Energy Resources Inc |
| Production reports | Proline Energy Resources Incthrough Apr 2019 |
| Latest permit | Southeastern Pipe Line Co.Apr 1, 1986 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 14,500
- total depth, ft
- 1
- permits on file
- Apr 1, 1986
- last permit issued
- Jan 20, 1987
- completed
- 0
- cumulative oil, bbl
- 2.22M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jan 20, 1987
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Talley, Lee A G-3-123583 | Orchard, North (Wilcox) | Proline Energy Resources Inc | 1 | 0 | 2.22M | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Southeastern Pipe Line CompanyJan 1993 → May 2017
- 2Proline Energy Resources IncJan 2019 → Apr 2019
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 300484-99 | Drill | Southeastern Pipe Line Co. | Mar 24, 1986 | Apr 1, 1986 | — | 14,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-123583 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 151 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 12,508 | 13,150 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 3,508 | 14.75 | 2,170 S |
| 7.625 | 11,600 | 9.875 | 2,006 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 9, 1987 | Mar 5, 1987 | Yes |
| 00 | Mar 31, 1987 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-157-31695 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-157-31695 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/15731695, documented in the API reference.