WELL · 42-157-31760 · DISTRICT 3

Winston #1

Plugged

Fort Bend County · Needville South (Miocene 4100) field  · Vertical

Winston #1 (API 42-157-31760) is a plugged well in Fort Bend County, plugged February 23, 2007, last operated by Pace Production CO..

The RRC has issued 2 drilling permits between 1987 and 1988, permitted to 8,600 ft.

It was permitted by Venus Oil Company and has since transferred to Pace Production CO. on the wellbore schedule.

Completion filings report 5 formation tops, including Miocene (undifferentiated), Frio, Vicksburg, Top Vicksbury.

Operator of record

Pace Production Co.

Permitted by Venus Oil Company; the EWA schedule now lists a different operator.

San Angelo, TX · P-5 Y, filed Jan 5, 2026 · 1 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePace Production Co.
Production reportsCook Marshall Operating, Inc.through Oct 1994
Latest permitVenus Oil CompanyDec 22, 1988

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,600
total depth, ft
2
permits on file
Dec 22, 1988
last permit issued
Jan 30, 1995
completed
0
cumulative oil, bbl
78.1K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 2007

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 30, 1995
Shut in
—
Plugged
Feb 23, 2007

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Winston G-3-131155Needville, South (Miocene 4100)Pace Production Co.1078.1KJan 1993 – Feb 2007

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Venus Oil CompanyJan 1993 → May 1994
  2. 2Cook Marshall Operating, Inc.Aug 1994 → Oct 1994

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
354569-99RecompletionVenus Oil CompanyDec 22, 1988Dec 22, 1988—8,500
338178-99DrillVenus Oil CompanyOct 30, 1987Oct 30, 1987—8,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-131155————

Formation tops

As filed on W-2/G-1. Subsea from 75 ft elevation.Download CSV →

FormationMD ftSubsea
Miocene (undifferentiated)BASE MIOCENE TOP ANAHUAC5,000-4,925
Miocene (undifferentiated)BASE MIOCENE/TOP ANAHUAC5,000-4,925
Frio5,500-5,425
FrioTOP FRIO5,500-5,425
FrioLOWER FRIO7,100-7,025
VicksburgTOP VICKSBURG7,500-7,425
Top Vicksbury7,500-7,425
Vicksbury7,500-7,425

Perforations

Perforated and open-hole intervals.

FromToType
4,0824,086Perforated
4,2044,220Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,81814.75920 S
7.6257,3969.875875 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 5, 1995Mar 21, 1995—
00Sep 13, 1989Mar 6, 1989Yes
00Sep 1, 1989——
00Jul 11, 1988Jan 12, 1988Yes
00Jun 30, 1988——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
180K
bbl, all reported
Dec 2000
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000082111H-1 InjectionPlugged Mar 15, 20072502,0004,000–4,150

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0119992000

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/15731760, documented in the API reference.