WELL · 42-159-00256 · DISTRICT 6

Maxton O. S. #16 D

N

Franklin County · Talco field  · Vertical

Maxton O. S. #16 D (API 42-159-00256) is a well in Franklin County operated by Exxon Mobil Corporation, completed October 28, 1983.

The RRC has issued one drilling permit, issued August 12, 1983, permitted to 4,428 ft.

It was permitted by Mobil Producing TX. & N.M. Inc. and has since transferred to Exxon Mobil Corporation on the wellbore schedule.

Its 2 leases have reported 4.12M barrels of oil and 23 mcf of gas since January 1993, last reporting in July 2026. The leases carry 270 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit.

Operator of record

Exxon Mobil Corporation

Permitted by Mobil Producing TX. & N.M. Inc.; the EWA schedule now lists a different operator.

Spring, TX · P-5 Y, filed Jan 4, 2026 · 1,223 permits on file · (346) 305-8668

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleExxon Mobil Corporation
Production reportsJ.P. Oil Company, Inc.through Mar 2026
Latest permitMobil Producing TX. & N.M. Inc.Aug 12, 1983

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,428
total depth, ft
1
permits on file
Aug 12, 1983
last permit issued
Oct 28, 1983
completed
4.12M
cumulative oil, bbl
23
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 28, 1983
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 270 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Talco West Unit O-6-15028TalcoJ.P. Oil Company, Inc.2473.99M0Jul 2011 – Jul 2026
Maxton, O. S. O-6-2031TalcoExxon Mobil Corporation23123K23Jan 1993 – Oct 2011

Oil, barrels lease total

Last 12 months 164,335 · prior 12 186,765(-12%)

010K20K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Mar 2000
  2. 2Exxon Mobil CorporationApr 2000 → Dec 2013
  3. 3XTO Energy Inc.Jan 2014 → Oct 2023
  4. 4J.P. Oil Company, Inc.Nov 2023 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
205320-99RecompletionMobil Producing TX. & N.M. Inc.Aug 8, 1983Aug 12, 1983—4,428

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-6-2031————
—— O-6-15028————

Perforations

Perforated and open-hole intervals.

FromToType
3,3003,350Perforated
4,4184,378Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.7525913.75225 S
3.53,250——
3.54,060——
74,2679350 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 20, 2011Nov 28, 1983—
00Jan 12, 1984Nov 28, 1983—
00Jan 12, 1984May 29, 1979—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
5.13M
bbl, all reported
Jun 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000006198W-14 DisposalActive003,300–3,425

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/15900256, documented in the API reference.