WELL · 42-159-00549 · DISTRICT 6

New Hope Unit #681

N

Franklin County · New Hope (Bacon Lime) field  · Vertical

New Hope Unit #681 (API 42-159-00549) is a well in Franklin County operated by J.P. Oil Company Inc., completed June 19, 1975.

The RRC has issued 2 drilling permits between 2010 and 2014, permitted to 12,656 ft.

It was permitted by Xto Energy Inc. and has since transferred to J.P. Oil Company Inc. on the wellbore schedule.

Completion filings report 6 formation tops, including BMA, Bacon, Gloyd, James Lime.

Its 2 leases have reported 1.55M barrels of oil and 2.76M mcf of gas since January 1993, last reporting in July 2026. The leases carry 38 wells, so these are lease totals, not this well alone.

Operator of record

J.P. Oil Company Inc.

Permitted by XTO Energy Inc.; the EWA schedule now lists a different operator.

Lafayette, LA · P-5 Y, filed Feb 4, 2026 · (337) 234-1170

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJ.P. Oil Company Inc.
Production reportsJ.P. Oil Company, Inc.through Mar 2026
Latest permitXTO Energy Inc.Sep 12, 2014

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,656
total depth, ft
2
permits on file
Sep 12, 2014
last permit issued
Jun 19, 1975
completed
1.55M
cumulative oil, bbl
2.76M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 19, 1975
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 38 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
New Hope Unit O-6-1126New Hope (Bacon Lime)J.P. Oil Company, Inc.21476K241KJan 1993 – Jul 2026
New Hope Unit O-6-5897New Hope (Elledge)J.P. Oil Company, Inc.171.08M2.52MJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 28,129 · prior 12 29,302(-4%)

02K4K202420252026

Gas, mcf lease total

Last 12 months 50,804 · prior 12 63,379(-20%)

05K10K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Jan 1993 → May 2002
  2. 2Chevron U. S. A. Inc.Jun 2002 → Aug 2004
  3. 3XTO Energy Inc.Sep 2004 → Oct 2023
  4. 4J.P. Oil Company, Inc.Nov 2023 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
794296-99RecompletionXTO Energy Inc.Aug 15, 2014Sep 12, 2014Oct 17, 20148,265
696211-99RecompletionXTO Energy Inc.May 18, 2010May 26, 2010Apr 16, 201012,656

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-6-1126————
—— O-6-5897————

Formation tops

As filed on W-2/G-1. Subsea from 390 ft elevation.Download CSV →

FormationMD ftSubsea
BMA7,185-6,795
Bacon7,357-6,967
Gloyd7,588-7,198
James LimeJAMES7,743-7,353
"C" Sand7,977-7,587
C Sand7,977-7,587

Perforations

Perforated and open-hole intervals.

FromToType
7,3467,362Perforated
7,9248,008Perforated
7,9788,235Perforated
8,2308,235Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
94,780——
5.58,2638.75—

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 14, 2015Mar 19, 2015—
00Aug 31, 2011Mar 7, 2011—
00Jan 12, 1984Sep 2, 1975—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.