WELL · 42-159-00551 · DISTRICT 6
Hanvie, H. V. #1
Franklin County · Sidetrack
Hanvie, H. V. #1 (API 42-159-00551) is a disposal or injection well in Franklin County operated by Dynegy Midstream Services, LP under an active UIC permit.
The RRC has issued 2 drilling permits between 1998 and 1999, permitted to 8,260 ft.
Completion filings report 3 formation tops, including Woodbine, Bacon, Hill.
It holds an active disposal or injection permit, with 589 barrels injected in the 12 months reported through June 2025.
Operator of record
Houston, TX · P-5 Y, filed Apr 4, 2008 · 10 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | Dynegy Midstream Services, LPJan 12, 1999 |
- 8,260
- total depth, ft
- 2
- permits on file
- Jan 12, 1999
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hanvie, H. V. O-6-10051 | New Hope | Sulphur River Exploration, Inc. | 1 | 0 | 0 | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 481986-99 | Recompletion | Dynegy Midstream Services, LP | Jan 12, 1999 | Jan 12, 1999 | Nov 20, 1998 | 8,260 |
| 480638-99 | Recompletion · sidetrack | Dynegy Midstream Services, LP | Nov 4, 1998 | Nov 4, 1998 | — | 8,260 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-6-10051 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 11 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Woodbine | 4,120 | -4,109 |
| Bacon | 7,458 | -7,447 |
| Hill | 7,585 | -7,574 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,540 | 4,560 | Perforated |
| 4,615 | 4,635 | Perforated |
| 4,665 | 4,685 | Perforated |
| — | 4,540 | Perforated |
| — | 7,976 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 217 | 17.5 | 350 S |
| 13.375 | 217 | — | 350 S |
| 9.625 | 4,790 | 12.5 | 1,000 S |
| 9.625 | 4,790 | — | 1,000 S |
| 5.5 | 4,799 | 8.75 | 820 S |
| 5.5 | 8,128 | — | 1,200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 10, 2016 | Nov 10, 2016 | — |
| 00 | Jan 18, 2000 | Jan 7, 1999 | — |
| 00 | Jan 12, 1984 | Apr 26, 1978 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-159-00551 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-159-00551 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 589
- bbl, last 12 reported months
- 4.69M
- bbl, all reported
- Jun 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000005979 | W-14 Disposal | Active | 3,000 | 1,000 | 4,330–4,755 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 589 · prior 12 4,473(-87%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/15900551, documented in the API reference.