WELL · 42-159-30209 · DISTRICT 6

Rutherford Kate A #7

N

Franklin County · Talco field  · Vertical

Rutherford Kate A #7 (API 42-159-30209) is a well in Franklin County operated by Exxon Mobil Corporation, completed June 2, 1979.

The RRC has issued 2 drilling permits between 1979 and 1986, permitted to 4,620 ft.

It was permitted by Mobil Producing TX. & N.M. Inc. and has since transferred to Exxon Mobil Corporation on the wellbore schedule.

Its 2 leases have reported 4.18M barrels of oil and 23 mcf of gas since January 1993, last reporting in July 2026. The leases carry 262 wells, so these are lease totals, not this well alone.

Operator of record

Exxon Mobil Corporation

Permitted by Mobil Producing TX. & N.M. Inc.; the EWA schedule now lists a different operator.

Spring, TX · P-5 Y, filed Jan 4, 2026 · 1,223 permits on file · (346) 305-8668

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleExxon Mobil Corporation
Production reportsJ.P. Oil Company, Inc.through Mar 2026
Latest permitMobil Producing TX. & N.M. Inc.Apr 2, 1986

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,620
total depth, ft
2
permits on file
Apr 2, 1986
last permit issued
Jun 2, 1979
completed
4.18M
cumulative oil, bbl
23
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 2, 1979
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 262 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Talco West Unit O-6-15028TalcoJ.P. Oil Company, Inc.2473.99M0Jul 2011 – Jul 2026
Rutherford, Kate "A" O-6-1714TalcoExxon Mobil Corporation15186K23Jan 1993 – Oct 2011

Oil, barrels lease total

Last 12 months 164,335 · prior 12 186,765(-12%)

010K20K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Mar 2000
  2. 2Exxon Mobil CorporationApr 2000 → Dec 2013
  3. 3XTO Energy Inc.Jan 2014 → Oct 2023
  4. 4J.P. Oil Company, Inc.Nov 2023 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
300717-99RecompletionMobil Producing TX. & N.M. Inc.Feb 27, 1986Apr 2, 1986—4,620
40564-99DrillMobil Oil CorporationJan 10, 1979Jan 10, 1979May 11, 19794,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-6-1714————
—— O-6-15028————

Perforations

Perforated and open-hole intervals.

FromToType
4,2594,266Perforated
4,5004,540Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.7515314.75120 S
10.75153——
4.54,340——
74,6209.875980 S
74,620——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 20, 2011Apr 25, 2008—
00Jan 13, 2009Apr 25, 2008—
00Oct 30, 1986Sep 22, 1986Yes
00Jun 26, 1986May 5, 1986Yes
00Jun 25, 1986——
00Jan 12, 1984Jul 24, 1979—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
2.42M
bbl, all reported
Mar 1989
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000006197H-1 InjectionCanceled Aug 30, 1989000–0

MONTHLY INJECTED, BBL · H-10 · LAST 2 REPORTED MONTHS

Last 12 months 0

011989

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/15930209, documented in the API reference.