WELL · 42-159-30228 · DISTRICT 6
Terry, Jimmie Kate #19 D
Franklin County · Vertical
Terry, Jimmie Kate #19 D (API 42-159-30228) is a former disposal or injection well in Franklin County, last operated by American Petrofina CO. Of Tex.; its UIC permit is no longer active.
The RRC has issued 2 drilling permits in 1980, permitted to 5,270 ft.
Its lease has reported 22.8K barrels of oil and 41 mcf of gas since January 1993, last reporting in July 2026. The lease carries 14 wells, so these are lease totals, not this well alone.
Operator of record
American Petrofina Co. of Tex.
Dallas, TX · P-5 Y, filed Nov 15, 1985 · 831 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Precise Development, Inc.through Nov 1997 |
| Latest permit | American Petrofina Co. of Tex.Sep 3, 1980 |
- 5,270
- total depth, ft
- 2
- permits on file
- Sep 3, 1980
- last permit issued
- —
- completed
- 22.8K
- cumulative oil, bbl
- 41
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 14 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Terry, Jimmie Kate O-6-1616 | Talco | Caddo Energy Co., Inc. | 14 | 22.8K | 41 | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Fina Oil & Chemical CompanyJan 1993 → Feb 1994
- 2Meridian Oil Production Inc.Mar 1994 → Aug 1995
- 3MGR ResourcesMar 1996 → Jul 1996
- 4Tyler Exxel Oil and Gas, Inc.Aug 1996 → Nov 1996
- 5Executive Production, Inc.Dec 1996 → Sep 1997
- 6Precise Development, Inc.Oct 1997 → Nov 1997
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 91315-99 | Drill | American Petrofina Co. of Tex. | Sep 3, 1980 | Sep 3, 1980 | Jun 2, 1980 | 5,270 |
| 78062-99 | Drill | American Petrofina Co. of Tex. | Apr 2, 1980 | Apr 2, 1980 | Jun 2, 1980 | 5,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-6-1616 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| — | 5,020 | Perforated |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-159-30228 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-159-30228 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 5.04M
- bbl, all reported
- Jun 1997
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000006156 | W-14 Disposal | Plugged Nov 2, 2011 | 11,000 | 1,300 | 4,976–5,020 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/15930228, documented in the API reference.