WELL · 42-159-30269 · DISTRICT 6

Dawson P. J. #25D

N

Franklin County · Talco field  · Vertical

Dawson P. J. #25D (API 42-159-30269) is a well in Franklin County operated by Exxon Mobil Corporation, completed May 7, 1981.

The RRC has issued one drilling permit, issued April 20, 1981, permitted to 4,600 ft.

It was permitted by Exxon Corp. and has since transferred to Exxon Mobil Corporation on the wellbore schedule.

Completion filings report 4 formation tops, including Pecan Gap, Ector, Eagle Ford, Pecan.

Its 2 leases have reported 4.5M barrels of oil and 23 mcf of gas since January 1993, last reporting in July 2026. The leases carry 267 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 6.46M barrels injected in the 12 months reported through June 2025.

Operator of record

Exxon Mobil Corporation

Permitted by Exxon Corp.; the EWA schedule now lists a different operator.

Spring, TX · P-5 Y, filed Jan 4, 2026 · 1,223 permits on file · (346) 305-8668

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleExxon Mobil Corporation
Production reportsJ.P. Oil Company, Inc.through Mar 2026
Latest permitExxon Corp.Apr 20, 1981

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,600
total depth, ft
1
permits on file
Apr 20, 1981
last permit issued
May 7, 1981
completed
4.5M
cumulative oil, bbl
23
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 7, 1981
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 267 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Talco West Unit O-6-15028TalcoJ.P. Oil Company, Inc.2473.99M0Jul 2011 – Jul 2026
Dawson, P. J. O-6-1665TalcoExxon Mobil Corporation20509K23Jan 1993 – Oct 2011

Oil, barrels lease total

Last 12 months 164,335 · prior 12 186,765(-12%)

010K20K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Mar 2000
  2. 2Exxon Mobil CorporationApr 2000 → Dec 2013
  3. 3XTO Energy Inc.Jan 2014 → Oct 2023
  4. 4J.P. Oil Company, Inc.Nov 2023 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
115638-99DrillExxon Corp.Apr 20, 1981Apr 20, 1981Apr 27, 19814,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-6-1665————
—— O-6-15028————

Formation tops

As filed on W-2/G-1. Subsea from 373 ft elevation.Download CSV →

FormationMD ftSubsea
Pecan Gap1,674-1,301
Ector2,885-2,512
Eagle FordEAGLEFORD2,953-2,580
Pecan16,674-16,301
Pecan Gap16,674-16,301

Perforations

Perforated and open-hole intervals.

FromToType
3,2303,353Perforated
3,2303,353Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.7520814.75405 S
10.7550014.75500 S
4.53,200——
7.3753,2039.875744 S
7.6253,2309.625744 S
7.3753,2309.875744 S
7.6254,5509.625800 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 23, 2024Aug 18, 2023—
00Nov 7, 2013Sep 9, 2013—
00Apr 3, 2012Mar 2, 2012—
00Jun 20, 2011Apr 27, 1987—
00May 22, 1987Apr 27, 1987—
00Jan 12, 1984Jul 15, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

6.46M
bbl, last 12 reported months
174M
bbl, all reported
Jun 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000044185W-14 DisposalActive25,0001,2502,500–3,353

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 6,462,838 · prior 12 7,212,222(-10%)

0500K1M20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/15930269, documented in the API reference.