WELL · 42-159-30363 · DISTRICT 6

Lindley Pat #1

Plugged

Franklin County · Mt. Vernon (Travis Peak) field  · Vertical

Lindley Pat #1 (API 42-159-30363) is a plugged well in Franklin County, plugged September 23, 1986, last operated by Noble & Cantrell Exploration CO..

The RRC has issued one drilling permit, issued August 17, 1984, permitted to 7,300 ft.

It was permitted by Sklar & Phillips Oil CO. and has since transferred to Noble & Cantrell Exploration CO. on the wellbore schedule.

Completion filings report 6 formation tops, including Nacatcoh, Austin Chalk, Lower Cretaceous, Paluxy.

Operator of record

Noble & Cantrell Exploration Co.

Permitted by Sklar & Phillips Oil Co.; the EWA schedule now lists a different operator.

Winnsboro, TX · P-5 Y, filed Jun 15, 1987 · 36 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleNoble & Cantrell Exploration Co.
Production reportsnone
Latest permitSklar & Phillips Oil Co.Aug 17, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,300
total depth, ft
1
permits on file
Aug 17, 1984
last permit issued
Oct 8, 1984
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 8, 1984
Shut in
—
Plugged
Sep 23, 1986

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
248675-99DrillSklar & Phillips Oil Co.Aug 16, 1984Aug 17, 1984Sep 2, 19847,300

Formation tops

As filed on W-2/G-1. Subsea from 490 ft elevation.Download CSV →

FormationMD ftSubsea
Nacatcoh1,085-595
Austin Chalk2,924-2,434
Lower Cretaceous4,272-3,782
Paluxy5,195-4,705
B Massive Anhydrite6,675-6,185
Travis Peak7,120-6,630

Perforations

Perforated and open-hole intervals.

FromToType
7,1367,146Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62527512.25170 S
4.57,1567.875250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 15, 1984Oct 19, 1984—
00Nov 9, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/15930363, documented in the API reference.