WELL · 42-159-30492 · DISTRICT 6

New Hope Unit #1202

N

Franklin County  · Vertical

New Hope Unit #1202 (API 42-159-30492) is a permitted well in Franklin County filed by Xto Energy Inc.; no completion report is on file yet.

The RRC has issued 2 drilling permits between 1993 and 2015, permitted to 9,350 ft.

Completion filings report 4 formation tops, including Bacon Lime, Young, Pittsburg, Elledge.

Its lease has reported 1.59M barrels of oil and 729K mcf of gas since January 1993, last reporting in July 2026. The lease carries 40 wells, so these are lease totals, not this well alone.

Operator of record

XTO Energy Inc.

Spring, TX · P-5 Y, filed Feb 4, 2026 · 16,156 permits on file · (832) 625-1100

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsJ.P. Oil Company, Inc.through Mar 2026
Latest permitXTO Energy Inc.Jul 30, 2015
9,350
total depth, ft
2
permits on file
Jul 30, 2015
last permit issued
—
completed
1.59M
cumulative oil, bbl
729K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 40 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
New Hope Unit O-6-1120New HopeJ.P. Oil Company, Inc.401.59M729KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 20,849 · prior 12 22,814(-9%)

01K2K3K202420252026

Gas, mcf lease total

Last 12 months 3,693 · prior 12 3,201(+15%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Jan 1993 → May 2002
  2. 2Chevron U. S. A. Inc.Jun 2002 → Aug 2004
  3. 3XTO Energy Inc.Sep 2004 → Oct 2023
  4. 4J.P. Oil Company, Inc.Nov 2023 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
808923-99RecompletionXTO Energy Inc.Jul 29, 2015Jul 30, 2015—8,350
417057-99DrillTexaco E & P Inc.Oct 13, 1993Oct 15, 1993Oct 21, 19939,350

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-6-1120————

Formation tops

As filed on W-2/G-1. Subsea from 431 ft elevation.Download CSV →

FormationMD ftSubsea
Bacon Lime7,307-6,876
Young7,723-7,292
Pittsburg7,821-7,390
Elledge8,180-7,749

Perforations

Perforated and open-hole intervals.

FromToType
7,8868,053Perforated
7,9167,926Perforated
7,9607,970Perforated
8,0478,053Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
1660——
9.62586512.25370 S
9.62586512.5370 S
5.58,3508.751,330 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 17, 2014Nov 25, 2014—
00Aug 26, 1994Apr 12, 1994Yes
00Aug 10, 1994——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/15930492, documented in the API reference.