WELL · 42-159-30647 · DISTRICT 6

AM-73 #1

N

Franklin County  · Vertical

AM-73 #1 (API 42-159-30647) is a permitted well in Franklin County filed by Energy Transfer Company; no completion report is on file yet.

The RRC has issued one drilling permit, issued August 29, 2025, permitted to 250 ft.

Operator of record

Energy Transfer Company

Houston, TX · P-5 Y, filed Nov 4, 2025 · 128 permits on file · (800) 777-6444

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitEnergy Transfer CompanyAug 29, 2025
250
total depth, ft
1
permits on file
Aug 29, 2025
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

33.340022, -95.172988

OpenStreetMap → ·  Google Maps →

Permit surface location from the RRC GIS record, in Franklin County.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
909936-99DrillEnergy Transfer CompanyAug 19, 2025Aug 29, 2025—250

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/15930647, documented in the API reference.