WELL · 42-161-30143 · DISTRICT 5

Thompson C.C. #1

N

Freestone County · Freestone (Cotton Valley) field  · Vertical

Thompson C.C. #1 (API 42-161-30143) is a well in Freestone County operated by EP Operating Company, completed September 23, 1976.

The RRC has issued 2 drilling permits between 1980 and 1995, permitted to 13,000 ft.

It was permitted by Enserch Exploration, Inc and has since transferred to EP Operating Company on the wellbore schedule.

Completion filings report one formation top, including Travis Peak.

No lease production has been reported under this well’s leases.

Operator of record

EP Operating Company

Permitted by Enserch Exploration, Inc; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed Jan 5, 1993 · 568 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEP Operating Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitEnserch Exploration, IncFeb 27, 1995

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,000
total depth, ft
2
permits on file
Feb 27, 1995
last permit issued
Sep 23, 1976
completed
0
cumulative oil, bbl
1.25M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 23, 1976
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Thompson, C.C. G-5-153775Freestone (Travis Peak)Hilcorp Energy Company101.18MFeb 1995 – Jul 2026
Thompson, C. C. Unit G-5-91952Freestone (Bossier Sand)Enserch Exploration, Inc1075.8KJan 1993 – Mar 1995

Gas, mcf lease total

Last 12 months 2,965 · prior 12 3,043(-3%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1EP Operating Limited PartnershipJan 1993 → Jan 1995
  2. 2Enserch Exploration, IncFeb 1995 → Mar 1998
  3. 3Eex CorporationApr 1998 → Apr 1998
  4. 4Cross Timbers Operating CompanyMay 1998 → May 2001
  5. 5XTO Energy Inc.Jun 2001 → Dec 2023
  6. 6Hilcorp Energy CompanyJan 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
433230-99RecompletionEnserch Exploration, IncFeb 24, 1995Feb 27, 1995Feb 3, 199512,858
101793-99RecompletionEnserch Exploration, IncDec 11, 1980Dec 11, 1980—13,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-5-91952————
—— G-5-153775————

Formation tops

As filed on W-2/G-1. Subsea from 429 ft elevation.Download CSV →

FormationMD ftSubsea
Travis Peak8,390-7,961

Perforations

Perforated and open-hole intervals.

FromToType
8,73810,404Perforated
11,94311,962Perforated
12,63112,764Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,00813.75586 S
9.6251,008——
2.87511,000——
711,3858.75750 S
711,385——
711,3918.75750 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 17, 1995Mar 15, 1995Yes
00May 3, 1995——
00Jan 12, 1984Feb 4, 1981—
00Jan 12, 1984Mar 21, 1977—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16130143, documented in the API reference.