WELL · 42-161-30496 · DISTRICT 5

Arco Fee #1

N

Freestone County · Neal (Smackover) field  · Directional

Arco Fee #1 (API 42-161-30496) is a well in Freestone County operated by Texaco Producing Inc., completed March 5, 1980.

The RRC has issued 3 drilling permits (amended once) between 1979 and 1990, permitted to 12,910 ft.

Completion filings report 3 formation tops, including Woodbine, Cotton Valley, Smackover.

No lease production has been reported under this well’s leases.

Operator of record

Texaco Producing Inc.

Midland, TX · P-5 Y, filed Sep 1, 1992 · 780 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTexaco Producing Inc.
Production reportsTGNR Gulf Coast LLCthrough Jul 2021
Latest permitTexaco Producing Inc.Oct 17, 1990

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,910
total depth, ft
4
permits on file
Oct 17, 1990
last permit issued
Mar 5, 1980
completed
0
cumulative oil, bbl
126K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 5, 1980
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Arco Fee Bossier Gas Unit G-5-137930Neal (Bossier)Diversified Production LLC10126KJan 1993 – Jul 2026
Arco Fee Unit O-5-3251Cheneyboro (Cotton Valley)Texaco E & P Inc.100Jan 1993 – May 1993

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Jan 1993 → Feb 1995
  2. 2Apache CorporationMar 1995 → Nov 2011
  3. 3Patara Oil & Gas LLCDec 2011 → Feb 2012
  4. 4Patara Andover I LLCMar 2012 → Feb 2014
  5. 5Cci Gulf Coast Upstream LLCMar 2014 → Dec 2020
  6. 6TGNR Gulf Coast LLCFeb 2021 → Jul 2021

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
379661-99RecompletionTexaco Producing Inc.Oct 17, 1990Oct 17, 1990Oct 20, 199012,400
343490-98RecompletionTexaco Producing Inc.May 12, 1988Mar 8, 1988—12,910
343490-99RecompletionTexaco Producing Inc.Mar 4, 1988Mar 8, 1988—12,910
48625-99DrillGetty Oil Co.May 16, 1979May 16, 1979Jun 21, 197912,910

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-5-137930————
—— O-5-3251————

Formation tops

As filed on W-2/G-1. Subsea from 291 ft elevation.Download CSV →

FormationMD ftSubsea
Woodbine3,854-3,563
Cotton ValleyCOTTON VALLEY LIME11,660-11,369
Smackover12,100-11,809

Perforations

Perforated and open-hole intervals.

FromToType
11,04611,086Perforated
11,10411,114Perforated
11,75211,762Perforated
12,13112,356Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37564817.5760 S
9.6254,45112.25670 S
710,4358.75970 S
2.87511,980——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 4, 1991Mar 28, 1991Yes
00May 2, 1991——
00Aug 31, 1988May 24, 1988Yes
00Aug 15, 1988——
00Jan 12, 1984Mar 19, 1980—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16130496, documented in the API reference.