WELL · 42-161-30812 · DISTRICT 5

Zeno King Unit No. 1 #2

Plugged

Freestone County · Teague (CV-Bossier Cons.) field  · Vertical

Zeno King Unit NO. 1 #2 (API 42-161-30812) is a plugged well in Freestone County, plugged August 20, 2014, last operated by Xto Energy Inc..

The RRC has issued one drilling permit, issued May 11, 1983, permitted to 12,800 ft.

It was permitted by Highland Resources, Inc. and has since transferred to Xto Energy Inc. on the wellbore schedule.

Completion filings report 3 formation tops, including Rodessa, Pettit, Cvl.

Operator of record

XTO Energy Inc.

Permitted by Highland Resources, Inc.; the EWA schedule now lists a different operator.

Spring, TX · P-5 Y, filed Feb 4, 2026 · 16,156 permits on file · (832) 625-1100

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleXTO Energy Inc.
Production reportsXTO Energy Inc.through Sep 2013
Latest permitHighland Resources, Inc.May 11, 1983

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,800
total depth, ft
1
permits on file
May 11, 1983
last permit issued
Apr 28, 2011
completed
0
cumulative oil, bbl
866K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2015

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 28, 2011
Shut in
—
Plugged
Aug 20, 2014

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Zeno King Unit No. 1 G-5-106917Teague Townsite (Cotton Valley)XTO Energy Inc.10866KJan 1993 – Mar 2015

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Brown, George R. Partnership,theJan 1993 → Apr 2003
  2. 2Brown, Geo. R Partnership,lp,theMay 2003 → Sep 2003
  3. 3XTO Energy Inc.Oct 2003 → Sep 2013

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
194754-99DrillHighland Resources, Inc.May 11, 1983May 11, 1983—12,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-5-106917————

Formation tops

As filed on W-2/G-1. Subsea from 506 ft elevation.Download CSV →

FormationMD ftSubsea
Rodessa7,450-6,944
Pettit7,840-7,334
CVL12,064-11,558

Perforations

Perforated and open-hole intervals.

FromToType
12,11412,179Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6254,79312.251,465 S
2.37512,009——
5.512,3258.751,000 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 5, 2012Sep 12, 2011—
00Jan 12, 1984Aug 29, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16130812, documented in the API reference.