WELL · 42-161-30889 · DISTRICT 5

Maynard #2C

N

Freestone County  · Vertical

Maynard #2C (API 42-161-30889) is a permitted well in Freestone County filed by Arcadia Expl. & Prod. Company; no completion report is on file yet.

The RRC has issued 5 drilling permits between 1984 and 1995, permitted to 7,800 ft.

Completion filings report 6 formation tops, including Anahuac, Frio, BMA, Rodessa.

Operator of record

Arcadia Expl. & Prod. Company

Kilgore, TX · P-5 Y, filed Aug 4, 2025 · 25 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsXTO Energy Inc.through Apr 2006
Latest permitArcadia Expl. & Prod. CompanyAug 4, 1995
7,800
total depth, ft
5
permits on file
Aug 4, 1995
last permit issued
—
completed
0
cumulative oil, bbl
180K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2009

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Maynard 1 G-5-112923Rischers Store (Nettle Sand)XTO Energy Inc.100Jan 1993 – Jul 2009
Maynard G-5-155590Rischers Store (Pettit)XTO Energy Inc.10180KJul 1995 – Jul 2009
Maynard G-5-121924Rischers Store (Hanson Sand)Arcadia Expl. & Prod. Company100Jan 1993 – Nov 1995

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Arcadia Expl. & Prod. CompanyAug 1995 → Oct 1998
  2. 2Hallwood Petroleum, Inc.Nov 1998 → Apr 1999
  3. 3XTO Energy Inc.Apr 2006 → Apr 2006

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
437683-99RecompletionArcadia Expl. & Prod. CompanyJul 10, 1995Aug 4, 1995Jul 18, 19957,800
303748-99RecompletionHinton Production CompanyMay 28, 1986Jul 1, 1986—7,800
266660-99DrillHinton Production CompanyDec 12, 1984Feb 11, 1985—7,800
239225-99DrillHinton Production CompanyDec 27, 1984May 2, 1984—7,800
227379-99DrillHinton Production CompanyJan 10, 1984Jan 20, 1984Jun 3, 19847,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-5-112923————
—— G-5-121924————
—— G-5-155590————

Formation tops

As filed on W-2/G-1. Subsea from 309 ft elevation.Download CSV →

FormationMD ftSubsea
Anahuac5,110-4,801
FrioTOP FRIO5,765-5,456
BMA6,302-5,993
Rodessa6,400-6,091
Pettit6,922-6,613
Travis Peak7,090-6,781
FrioBASE FRIO7,770-7,461

Perforations

Perforated and open-hole intervals.

FromToType
6,5006,510Perforated
6,9456,953Perforated
7,2937,300Perforated
7,3027,307Perforated
7,3277,338Perforated
7,3447,352Perforated
7,4867,492Perforated
8,4538,458Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,01012.25350 S
9.6253,00012.251,220 S
57,7008.75826 S
78,1718.75325 S
3.58,6506.125180 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 3, 2001Oct 9, 2001Yes
00Jan 10, 1996Aug 15, 1995Yes
00Oct 13, 1995——
00Sep 12, 1986Aug 13, 1986Yes
00Sep 10, 1986——
00Mar 4, 1985Jan 3, 1985—
00Feb 28, 1985Nov 12, 1984—
00Jan 15, 1985Dec 13, 1984—
00Oct 19, 1984Sep 19, 1984—
00Oct 17, 1984Jul 28, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16130889, documented in the API reference.