WELL · 42-161-31023 · DISTRICT 5

Sandlin, John C. #1

N

Freestone County  · Vertical

Sandlin, John C. #1 (API 42-161-31023) is a permitted well in Freestone County filed by Miller, B. H. Oil CO.; no completion report is on file yet.

The RRC has issued 2 drilling permits between 1984 and 1985, permitted to 3,200 ft.

Completion filings report 3 formation tops, including Nacatoch, Austin Chalk, Woodbine.

Operator of record

Miller, B. H. Oil Co.

Corsicana, TX · P-5 Y, filed Nov 5, 2004 · 16 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitMiller, B. H. Oil Co.Aug 8, 1985
3,200
total depth, ft
2
permits on file
Aug 8, 1985
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
282128-99DrillMiller, B. H. Oil Co.Aug 7, 1985Aug 8, 1985Aug 27, 19853,200
243866-99DrillMiller, B. H. Oil Co.May 30, 1984Jul 3, 1984—3,200

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Nacatoch1,130
Austin Chalk2,700
Woodbine2,983

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62512512.2550 S
5.53,1147.875150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 14, 1985Sep 25, 1985Yes
00Nov 9, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16131023, documented in the API reference.