WELL · 42-161-31097 · DISTRICT 5

Sneed-Bonner Unit #1

Plugged

Freestone County · Stewards Mill NE. (CVL) field  · Vertical

Sneed-Bonner Unit #1 (API 42-161-31097) is a plugged well in Freestone County, plugged July 23, 2012, last operated by Encana Oil & Gas(USA) Inc..

The RRC has issued 2 drilling permits between 1989 and 2002, permitted to 12,200 ft.

It was permitted by Matador Operating Company and has since transferred to Encana Oil & Gas(USA) Inc. on the wellbore schedule.

Completion filings report 4 formation tops, including Pettit, Bossier, Cotton Valley, Cvl.

Operator of record

Encana Oil & Gas(usa) Inc.

Permitted by Matador Operating Company; the EWA schedule now lists a different operator.

Denver, CO · P-5 Y, filed Oct 2, 2020 · 3,078 permits on file · (877) 386-2200

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEncana Oil & Gas(usa) Inc.
Production reportsEncana Oil & Gas(usa) Inc.through Jul 2012
Latest permitMatador Operating CompanyJan 28, 2002

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,200
total depth, ft
2
permits on file
Jan 28, 2002
last permit issued
Sep 1, 1989
completed
0
cumulative oil, bbl
1.56M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 2015

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 1, 1989
Shut in
—
Plugged
Jul 23, 2012

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Sneed Bonner Unit G-5-188928Marsters, N.E.Encana Oil & Gas(usa) Inc.10573KMay 2002 – Jan 2015
Sneed-Bonner Unit G-5-131907Stewards Mill, NE. (CVL)Encana Oil & Gas(usa) Inc.10988KJan 1993 – Jul 2012

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Hunt Oil CompanyJan 1993 → Nov 2001
  2. 2Matador Operating CompanyDec 2001 → Jul 2003
  3. 3Brown, Tom Inc.Aug 2003 → Dec 2004
  4. 4Encana Oil & Gas(usa) Inc.Jan 2005 → Jul 2012

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
516384-99RecompletionMatador Operating CompanyDec 21, 2001Jan 28, 2002Apr 2, 200211,987
359593-99DrillTerra Resources, Inc.May 23, 1989May 23, 1989May 30, 198912,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-5-131907————
—— G-5-188928————

Formation tops

As filed on W-2/G-1. Subsea from 288 ft elevation.Download CSV →

FormationMD ftSubsea
Pettit7,700-7,412
Bossier11,150-10,862
Cotton ValleyCOTTON VALLEY LIME11,700-11,412
CVL11,700-11,412

Perforations

Perforated and open-hole intervals.

FromToType
10,93910,938Perforated
10,99410,996Perforated
11,04811,051Perforated
11,13611,141Perforated
11,72111,838Perforated
11,72111,883Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6254,62612.251,890 S
5.511,9877.8751,483 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 10, 2002May 24, 2002Yes
00Jun 11, 2002——
00Oct 16, 1989Sep 14, 1989Yes
00Sep 29, 1989——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16131097, documented in the API reference.