WELL · 42-161-31392 · DISTRICT 5

Bragg Trust #1

Plugged

Freestone County · Stewards Mill NE. (CVL) field  · Vertical

Bragg Trust #1 (API 42-161-31392) is a plugged well in Freestone County, plugged August 15, 2013, last operated by Encana Oil & Gas(USA) Inc..

The RRC has issued 2 drilling permits between 1996 and 1999, permitted to 12,500 ft.

It was permitted by Hunt Oil Company and has since transferred to Encana Oil & Gas(USA) Inc. on the wellbore schedule.

Completion filings report 6 formation tops, including Massive Anhydrite (marker), James Lime, Pettit, Travis Peak.

Operator of record

Encana Oil & Gas(usa) Inc.

Permitted by Hunt Oil Company; the EWA schedule now lists a different operator.

Denver, CO · P-5 Inactive, filed Dec 19, 2019 · 3,078 permits on file · (303) 623-2300

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEncana Oil & Gas(usa) Inc.
Production reportsEncana Oil & Gas(usa) Inc.through Oct 2012
Latest permitHunt Oil CompanyOct 8, 1999

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,500
total depth, ft
2
permits on file
Oct 8, 1999
last permit issued
Jun 23, 1997
completed
0
cumulative oil, bbl
719K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 1997 THROUGH Jan 2015

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 23, 1997
Shut in
—
Plugged
Aug 15, 2013

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Bragg Trust G-5-176082Neal (Bossier)Encana Oil & Gas(usa) Inc.10211KDec 1999 – Jan 2015
Bragg Trust G-5-163733Stewards Mill, NE. (CVL)Encana Oil & Gas(usa) Inc.10508KJun 1997 – Aug 2013

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Hunt Oil CompanyJun 1997 → Nov 2001
  2. 2Matador Operating CompanyDec 2001 → Jul 2003
  3. 3Brown, Tom Inc.Aug 2003 → Dec 2004
  4. 4Encana Oil & Gas(usa) Inc.Jan 2005 → Oct 2012

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
488154-99RecompletionHunt Oil CompanyOct 4, 1999Oct 8, 1999Oct 28, 199912,000
454942-99DrillHunt Oil CompanyNov 8, 1996Nov 8, 1996Mar 24, 199712,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-5-163733————
—— G-5-176082————

Formation tops

As filed on W-2/G-1. Subsea from 359 ft elevation.Download CSV →

FormationMD ftSubsea
Massive Anhydrite (marker)MASSIVE ANHYDRITE6,742-6,383
James Lime7,388-7,029
Pettit7,554-7,195
Travis Peak7,770-7,411
BossierBOSSIER SAND10,640-10,281
BossierBOSSIER SD10,640-10,281
Cotton ValleyCOTTON VALLEY LIME11,690-11,331

Perforations

Perforated and open-hole intervals.

FromToType
10,89210,903Perforated
11,03411,080Perforated
11,71411,722Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6254,64012.25905 S
5.511,9868.751,530 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 4, 2000Jan 6, 2000—
00Mar 22, 2000——
00Aug 8, 1997Jun 30, 1997Yes
00Aug 6, 1997——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16131392, documented in the API reference.