WELL · 42-161-31394 · DISTRICT 5

Dunlap Gas Unit #1 #3

N

Freestone County · Reed (Haynesville) field  · Vertical

Dunlap Gas Unit #1 #3 (API 42-161-31394) is a well in Freestone County operated by Marathon Oil Company, completed January 16, 1997.

The RRC has issued 2 drilling permits between 1996 and 2000, permitted to 13,000 ft.

Completion filings report 7 formation tops, including Buda, Glen Rose, B. Mass. Anhydrite, Pettit.

No lease production has been reported under this well’s leases.

Operator of record

Marathon Oil Company

Houston, TX · P-5 Y, filed Apr 4, 2026 · 3,707 permits on file · (800) 332-9449

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMarathon Oil Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitMarathon Oil CompanyFeb 14, 2000

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,000
total depth, ft
2
permits on file
Feb 14, 2000
last permit issued
Jan 16, 1997
completed
0
cumulative oil, bbl
1.39M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1997 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 16, 1997
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Dunlap Gas Unit #1 G-5-176241Teague (CV-Bossier Cons.)Hilcorp Energy Company101.05MOct 1999 – Jul 2026
Dunlap Gas Unit #1 G-5-161967Reed (Haynesville)Marathon Oil Company10338KJan 1997 – Apr 2000

Gas, mcf lease total

Last 12 months 15,316 · prior 12 9,288(+65%)

01K2K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Marathon Oil CompanyJan 1997 → Apr 2002
  2. 2XTO Energy Inc.May 2002 → Dec 2023
  3. 3Hilcorp Energy CompanyJan 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
492065-99RecompletionMarathon Oil CompanyFeb 14, 2000Feb 14, 2000Sep 21, 199912,465
455180-99DrillMarathon Oil CompanyNov 15, 1996Nov 15, 1996Nov 16, 199613,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-5-161967————
—— G-5-176241————

Formation tops

As filed on W-2/G-1. Subsea from 351 ft elevation.Download CSV →

FormationMD ftSubsea
Buda4,773-4,422
Glen Rose6,097-5,746
B. Mass. Anhydrite7,234-6,883
Pettit7,898-7,547
Travis Peak8,100-7,749
Cotton Valley9,695-9,344
BossierBOSSIER SHALE11,200-10,849
Cotton ValleyCOTTON VALLEY LM12,014-11,663

Perforations

Perforated and open-hole intervals.

FromToType
11,02411,040Perforated
11,02411,156Perforated
11,06411,082Perforated
11,10011,156Perforated
11,18111,201Perforated
11,37111,386Perforated
12,02212,064Perforated
12,02212,106Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,582—535 S
8.6252,58211635 S
4.512,4657.875800 S
4.512,465—800 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 11, 2025Jun 19, 2025—
00Apr 19, 2000Dec 10, 1999Yes
00Mar 30, 2000——
00Mar 14, 1997Feb 7, 1997Yes
00Mar 12, 1997——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16131394, documented in the API reference.