WELL · 42-161-31569 · DISTRICT 5

Sneed Gas Unit #6

Y

Freestone County · Reed (Pettit) field · Temp Abandoned  · Vertical

Sneed Gas Unit #6 (API 42-161-31569) is a well in Freestone County operated by Hilcorp Energy Company, completed June 14, 1999 and listed as temp abandoned on the RRC schedule.

The RRC has issued one drilling permit, issued March 5, 1999, permitted to 10,800 ft.

It was permitted by Sonat Exploration Company -Tyler and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 5 formation tops, including T/Ferry Lake, T/James Lime, T/Pettit Lime, T/Travis Peak.

No lease production has been reported under this well’s leases.

Operator of record

Hilcorp Energy Company

Permitted by Sonat Exploration Company -Tyler; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Mar 26, 2026 · 3,454 permits on file · (713) 209-2411

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitSonat Exploration Company -TylerMar 5, 1999

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,800
total depth, ft
1
permits on file
Mar 5, 1999
last permit issued
Jun 14, 1999
completed
0
cumulative oil, bbl
3.57M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 1999 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 14, 1999
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Sneed Gas Unit G-5-173813Teague (CV-Bossier Cons.)Hilcorp Energy Company101.39MJun 1999 – Jul 2026
Sneed Gas Unit G-5-173814Reed (Travis Peak)Hilcorp Energy Company100Jun 1999 – Jul 2026
Sneed Gas Unit G-5-173816Reed (Pettit)Hilcorp Energy Company102.18MJun 1999 – Jul 2026

Gas, mcf lease total

Last 12 months 2,303 · prior 12 960(+140%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Sonat Exploration Company -TylerJun 1999 → Dec 1999
  2. 2EL Paso Production CompanyJan 2000 → Mar 2002
  3. 3Hunt Petroleum CorporationApr 2002 → Nov 2008
  4. 4XTO Energy Inc.Dec 2008 → Dec 2023
  5. 5Hilcorp Energy CompanyJan 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
483104-99DrillSonat Exploration Company -TylerMar 5, 1999Mar 5, 1999Apr 11, 199910,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-5-173813————
—— G-5-173814————
—— G-5-173816————

Formation tops

As filed on W-2/G-1. Subsea from 424 ft elevation.Download CSV →

FormationMD ftSubsea
T/Ferry Lake7,078-6,654
T/James Lime7,583-7,159
T/Pettit Lime7,732-7,308
T/Travis Peak7,934-7,510
T/Cotton Valley9,876-9,452

Perforations

Perforated and open-hole intervals.

FromToType
7,7467,766Perforated
8,2059,918Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62519112.25620 S
9.6251,91012.25620 S
4.510,1868.751,300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 24, 1999Jul 14, 1999Yes
00Aug 23, 1999Jul 14, 1999—
00Aug 13, 1999—Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16131569, documented in the API reference.