WELL · 42-161-32048 · DISTRICT 5
Hunt Gas Unit 4 #4
Freestone County · Donie (Pettit) field · Producing · Vertical
Hunt Gas Unit 4 #4 (API 42-161-32048) is a well in Freestone County operated by Hilcorp Energy Company, completed July 31, 2012 and listed as producing on the RRC schedule.
The RRC has issued 2 drilling permits between 2001 and 2012, permitted to 13,170 ft.
It was permitted by Xto Energy Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.
Completion filings report 7 formation tops, including Glen Rose, James Lime, T/James Lime, Travis Peak.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by XTO Energy Inc.; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Mar 26, 2026 · 3,454 permits on file · (713) 209-2411
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hilcorp Energy Company |
| Production reports | Hilcorp Energy Companythrough Apr 2026 |
| Latest permit | XTO Energy Inc.Aug 27, 2012 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 13,170
- total depth, ft
- 2
- permits on file
- Aug 27, 2012
- last permit issued
- Jul 31, 2012
- completed
- 0
- cumulative oil, bbl
- 611K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 2001 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jul 31, 2012
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: X
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hunt Gas Unit 4 G-5-185827 | Dew (C.V. Consolidated) | Hilcorp Energy Company | 1 | 0 | 200K | Jun 2001 – Jul 2026 |
| Hunt Gas Unit 4 G-5-266334 | Donie (Pettit) | Hilcorp Energy Company | 1 | 0 | 411K | Jul 2012 – Jul 2026 |
Gas, mcf lease total
Last 12 months 5,747 · prior 12 9,889(-42%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1EL Paso Production CompanyJun 2001 → Mar 2002
- 2Hunt Petroleum CorporationApr 2002 → Nov 2008
- 3XTO Energy Inc.Dec 2008 → Dec 2023
- 4Hilcorp Energy CompanyJan 2024 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 745526-99 | Recompletion | XTO Energy Inc. | Jul 30, 2012 | Aug 27, 2012 | Jul 31, 2012 | 13,170 |
| 507073-99 | Drill | EL Paso Production Company | Mar 27, 2001 | Mar 27, 2001 | Apr 20, 2001 | 13,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-5-185827 | — | — | — | — |
| — | — G-5-266334 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 394 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Glen RoseGLENROSE | 6,680 | -6,286 |
| James Lime | 8,529 | -8,135 |
| T/James Lime | 8,529 | -8,135 |
| Travis Peak | 8,981 | -8,587 |
| T/Travis Peak | 8,981 | -8,587 |
| Bossier | 12,695 | -12,301 |
| T/Bossier | 12,695 | -12,301 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,860 | 8,874 | Perforated |
| 12,646 | 13,125 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 5,263 | 12.25 | 370 S |
| — | 5,263 | 12.25 | 1,310 S |
| 7 | 12,502 | 8.75 | 1,295 S |
| 9.625 | — | 12.25 | 370 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 28, 2013 | Oct 10, 2012 | — |
| 00 | Jan 4, 2002 | Nov 13, 2001 | Yes |
| 00 | Dec 7, 2001 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-161-32048 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-161-32048 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/16132048, documented in the API reference.