WELL · 42-161-32223 · DISTRICT 5
Ham Gas Unit #13
Freestone County · Vertical
Ham Gas Unit #13 (API 42-161-32223) is a permitted well in Freestone County filed by Xto Energy Inc.; no completion report is on file yet.
The RRC has issued 2 drilling permits between 2001 and 2014, permitted to 10,320 ft.
Completion filings report 4 formation tops, including Rodessa, Pettit, Travis Peak, Cotton Valley.
Operator of record
Spring, TX · P-5 Y, filed Feb 4, 2026 · 16,156 permits on file · (832) 625-1100
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Hilcorp Energy Companythrough Apr 2026 |
| Latest permit | XTO Energy Inc.Apr 16, 2014 |
- 10,320
- total depth, ft
- 2
- permits on file
- Apr 16, 2014
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 1.62M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2002 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Ham Gas Unit G-5-187196 | Teague (Travis Peak) | Hilcorp Energy Company | 1 | 0 | 1.62M | Jan 2002 – Jul 2026 |
Gas, mcf lease total
Last 12 months 1,408 · prior 12 1,645(-14%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Texaco E & P Inc.Jan 2002 → May 2002
- 2Chevron U. S. A. Inc.Jun 2002 → Jul 2004
- 3XTO Energy Inc.Aug 2004 → Dec 2023
- 4Hilcorp Energy CompanyJan 2024 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 781732-99 | Recompletion | XTO Energy Inc. | Mar 10, 2014 | Apr 16, 2014 | — | 10,316 |
| 514519-99 | Drill | Texaco E & P Inc. | Oct 16, 2001 | Oct 16, 2001 | Nov 25, 2001 | 10,320 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-5-187196 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 491 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Rodessa | 7,333 | -6,842 |
| Rodessa | 7,571 | -7,080 |
| Pettit | 8,015 | -7,524 |
| Travis Peak | 8,117 | -7,626 |
| Travis Peak | 8,238 | -7,747 |
| Cotton Valley | 10,151 | -9,660 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,992 | 9,297 | Perforated |
| 8,992 | 10,115 | Perforated |
| 10,005 | 10,115 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 16 | 60 | — | — |
| 8.625 | 2,603 | 12.25 | 450 S |
| 5.5 | 10,316 | 7.875 | 730 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 17, 2015 | Aug 27, 2014 | — |
| 00 | Apr 8, 2002 | Mar 4, 2002 | — |
| 00 | Mar 26, 2002 | Jan 18, 2002 | Yes |
| 00 | Mar 5, 2002 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-161-32223 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-161-32223 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/16132223, documented in the API reference.