WELL · 42-161-32258 · DISTRICT 5

Hall F. L. #4

Y

Freestone County · Farrar SE (Pettit) field · SWR-10-Well  · Directional

Hall F. L. #4 (API 42-161-32258) is a well in Freestone County operated by Hilcorp Energy Company, completed June 8, 2016 and listed as swr-10-well on the RRC schedule.

The RRC has issued 2 drilling permits between 2001 and 2016, permitted to 14,500 ft.

It was permitted by Xto Energy Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 8 formation tops, including BMA, Pettit, Travis Peak, Cotton Valley.

No lease production has been reported under this well’s leases.

Operator of record

Hilcorp Energy Company

Permitted by XTO Energy Inc.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Mar 26, 2026 · 3,454 permits on file · (713) 209-2411

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Jan 2026
Latest permitXTO Energy Inc.Apr 21, 2016

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

14,500
total depth, ft
2
permits on file
Apr 21, 2016
last permit issued
Jun 8, 2016
completed
0
cumulative oil, bbl
1.36M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 2002 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 8, 2016
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hall, F. L. G-5-190768Farrar (Cotton Valley Lime)Hilcorp Energy Company101.06MJul 2002 – Jul 2026
Hall, F. L. G-5-281955Farrar (Travis Peak)Hilcorp Energy Company10302KJun 2016 – Jul 2026
Hall, F. L. G-5-281972Farrar, SE (Pettit)Hilcorp Energy Company100Jun 2016 – Jul 2026

Gas, mcf lease total

Last 12 months 28 · prior 12 123(-77%)

050100202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1XTO Energy Inc.Jul 2002 → Oct 2023
  2. 2Hilcorp Energy CompanyJan 2024 → Jan 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
814998-99RecompletionXTO Energy Inc.Apr 12, 2016Apr 21, 2016May 3, 201614,054
515787-99DrillXTO Energy Inc.Dec 3, 2001Dec 6, 2001Apr 7, 200214,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-5-190768————
—— G-5-281955————
—— G-5-281972————

Formation tops

As filed on W-2/G-1. Subsea from 475 ft elevation.Download CSV →

FormationMD ftSubsea
BMA7,791-7,316
Pettit8,504-8,029
Travis Peak8,763-8,288
Cotton ValleyCOTTON VALLEY SAND10,718-10,243
Cotton ValleyCOTTON VALLEY SD10,718-10,243
CVS10,718-10,243
Bossier12,192-11,717
CV Lime13,694-13,219
CV LM13,694-13,219

Perforations

Perforated and open-hole intervals.

FromToType
8,5978,687Perforated
8,87710,022Perforated
10,83812,684Perforated
10,83813,983Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,27512.25490 S
8.7512,1568.75634 S
712,1568.75534 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 4, 2017Jul 21, 2016—
00Mar 31, 2017Jul 21, 2016—
00Apr 16, 2003Mar 10, 2003—
00Oct 21, 2002Sep 19, 2002Yes
00Oct 9, 2002——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16132258, documented in the API reference.