WELL · 42-161-32368 · DISTRICT 5
Cagle Gas Unit #5
Freestone County · Freestone (Bossier Sand) field · Vertical
Cagle Gas Unit #5 (API 42-161-32368) is a well in Freestone County operated by Xto Energy Inc., completed August 31, 2002.
The RRC has issued 2 drilling permits between 2002 and 2013, permitted to 13,500 ft.
Completion filings report 8 formation tops, including BMA, Pettit, Travis Peak, Cvs.
No lease production has been reported under this well’s leases.
Operator of record
Spring, TX · P-5 Y, filed Feb 4, 2026 · 16,156 permits on file · (832) 625-1100
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | XTO Energy Inc. |
| Production reports | XTO Energy Inc.through May 2012 |
| Latest permit | XTO Energy Inc.Nov 22, 2013 |
- 13,500
- total depth, ft
- 2
- permits on file
- Nov 22, 2013
- last permit issued
- Aug 31, 2002
- completed
- 0
- cumulative oil, bbl
- 2.12M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 2002 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 31, 2002
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Cagle Gas Unit G-5-192160 | Freestone (CV-Bossier Cons.) | Hilcorp Energy Company | 1 | 0 | 2.12M | Aug 2002 – Jul 2026 |
| Cagle Gas Unit G-5-276295 | Freestone (Travis Peak) | Hilcorp Energy Company | 1 | 0 | 0 | Mar 2015 – Jul 2026 |
| Cagle Gas Unit G-5-192158 | Freestone (Bossier Sand) | XTO Energy Inc. | 1 | 0 | 0 | Aug 2002 – Feb 2006 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1XTO Energy Inc.Aug 2002 → May 2012
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 773298-99 | Recompletion | XTO Energy Inc. | Nov 6, 2013 | Nov 22, 2013 | Feb 24, 2015 | 13,100 |
| 520041-99 | Drill | XTO Energy Inc. | May 16, 2002 | May 20, 2002 | Jul 9, 2002 | 13,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-5-192158 | — | — | — | — |
| — | — G-5-192160 | — | — | — | — |
| — | — G-5-276295 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 483 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,638 | 10,659 | Perforated |
| 11,262 | 12,942 | Perforated |
| 12,094 | 12,120 | Perforated |
| 12,094 | 12,942 | Perforated |
| 12,778 | 12,942 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,150 | 12.25 | 400 S |
| 7 | 11,743 | 8.75 | 1,055 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 8, 2015 | Mar 19, 2015 | — |
| 00 | Jun 8, 2011 | Feb 16, 2011 | — |
| 00 | Feb 27, 2007 | Oct 6, 2006 | — |
| 00 | Feb 11, 2003 | Dec 27, 2002 | Yes |
| 00 | Jan 10, 2003 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-161-32368 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-161-32368 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.