WELL · 42-161-32511 · DISTRICT 5

Scarborough Unit #5

N

Freestone County · Freestone (Cotton Valley) field  · Vertical

Scarborough Unit #5 (API 42-161-32511) is a well in Freestone County operated by Encana Oil & Gas(USA) Inc., completed February 1, 2003.

The RRC has issued one drilling permit, issued December 16, 2002, permitted to 13,100 ft.

It was permitted by Matador Operating Company and has since transferred to Encana Oil & Gas(USA) Inc. on the wellbore schedule.

Completion filings report 7 formation tops, including B/Austin Chalk, Rodessa, James Lime, Travis Peak.

No lease production has been reported under this well’s leases.

Operator of record

Encana Oil & Gas(usa) Inc.

Permitted by Matador Operating Company; the EWA schedule now lists a different operator.

Denver, CO · P-5 Y, filed Oct 2, 2020 · 3,078 permits on file · (877) 386-2200

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEncana Oil & Gas(usa) Inc.
Production reportsTGNR Gulf Coast LLCthrough Sep 2021
Latest permitMatador Operating CompanyDec 16, 2002

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,100
total depth, ft
1
permits on file
Dec 16, 2002
last permit issued
Feb 1, 2003
completed
0
cumulative oil, bbl
1.81M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 2003 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 1, 2003
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Scarborough Unit G-5-198355Freestone (CV-Bossier Cons.)Diversified Production LLC101.33MOct 2003 – Jul 2026
Scarborough Unit G-5-193619Freestone (Cotton Valley)Encana Oil & Gas(usa) Inc.10481KFeb 2003 – Feb 2006

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Matador Operating CompanyFeb 2003 → Jul 2003
  2. 2Brown, Tom Inc.Aug 2003 → Dec 2004
  3. 3Encana Oil & Gas(usa) Inc.Jan 2005 → Oct 2012
  4. 4Edf Trading Resources, LLCNov 2012 → Jul 2015
  5. 5Cci Gulf Coast Upstream LLCAug 2015 → Jan 2021
  6. 6TGNR Gulf Coast LLCFeb 2021 → Sep 2021

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
526351-99DrillMatador Operating CompanyDec 13, 2002Dec 16, 2002Dec 29, 200213,100

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-5-193619————
—— G-5-198355————

Formation tops

As filed on W-2/G-1. Subsea from 457 ft elevation.Download CSV →

FormationMD ftSubsea
B/Austin Chalk4,180-3,723
Rodessa7,510-7,053
James LimeJAMES7,930-7,473
Travis Peak8,290-7,833
Cotton Valley10,560-10,103
BossierBOSSIER SAND11,600-11,143
BossierBOSSIER SD11,600-11,143
CV Lime12,550-12,093

Perforations

Perforated and open-hole intervals.

FromToType
11,63011,636Perforated
11,67311,679Perforated
12,60712,614Perforated
12,68612,693Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,50312.25830 S
5.512,8908.75640 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 27, 2006Apr 12, 2005—
00Apr 13, 2004Feb 10, 2004—
00Jan 30, 2004Nov 10, 2003—
00Jan 9, 2004——
00Apr 24, 2003Mar 17, 2003Yes
00Apr 4, 2003——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16132511, documented in the API reference.