WELL · 42-161-33994 · DISTRICT 5

H. L. & P. Gas Unit #21

Y

Freestone County · Bear Grass (Cotton Valley Cons) field · Producing  · Vertical

H. L. & P. Gas Unit #21 (API 42-161-33994) is a well in Freestone County operated by Hilcorp Energy Company, completed December 6, 2012 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits between 2007 and 2009, permitted to 14,500 ft.

It was permitted by Xto Energy Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 4 formation tops, including Pettit, Bossier, Cvl, Cotton Valley.

No lease production has been reported under this well’s leases.

Operator of record

Hilcorp Energy Company

Permitted by XTO Energy Inc.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Mar 26, 2026 · 3,454 permits on file · (713) 209-2411

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitXTO Energy Inc.May 1, 2009

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

14,500
total depth, ft
2
permits on file
May 1, 2009
last permit issued
Dec 6, 2012
completed
0
cumulative oil, bbl
1.95M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 2008 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 6, 2012
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
H. L. & P. Gas Unit G-5-234843Farrar (Cotton Valley Lime)Hilcorp Energy Company101.95MFeb 2008 – Jul 2026

Gas, mcf lease total

Last 12 months 37,319 · prior 12 39,423(-5%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Hunt Petroleum CorporationFeb 2008 → Nov 2008
  2. 2XTO Energy Inc.Dec 2008 → Dec 2023
  3. 3Hilcorp Energy CompanyJan 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
680792-99Field transferXTO Energy Inc.Apr 28, 2009May 1, 2009Dec 4, 200714,300
644826-99DrillHunt Petroleum CorporationAug 22, 2007Aug 23, 2007Dec 4, 200714,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-5-234843————

Formation tops

As filed on W-2/G-1. Subsea from 479 ft elevation.Download CSV →

FormationMD ftSubsea
Pettit8,722-8,243
PettitTOP PETTIT8,722-8,243
Bossier12,522-12,043
BossierTOP BOSSIER12,522-12,043
CVL13,746-13,267
Cotton ValleyTOP COTTON VALLEY LIME13,746-13,267

Perforations

Perforated and open-hole intervals.

FromToType
11,49613,888Perforated
12,61612,788Perforated
13,85813,888Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6253,83012.251,321 S
712,3958.75890 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 13, 2013Feb 1, 2013—
00Oct 12, 2009Apr 14, 2009—
00Jul 14, 2008May 8, 2008—
00May 29, 2008Mar 28, 2008Yes
00May 9, 2008——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16133994, documented in the API reference.