WELL · 42-161-34095 · DISTRICT 5

Studdard Steward M #1

Y

Freestone County · Nan-SU-Gail (CV Consolidated) field · Producing  · Vertical

Studdard Steward M #1 (API 42-161-34095) is a well in Freestone County operated by Barrow-Shaver Resources CO., completed September 3, 2010 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits between 2008 and 2011, permitted to 15,000 ft.

Completion filings report 3 formation tops, including Glhrs, Pet, Boss.

No lease production has been reported under this well’s leases.

Operator of record

Barrow-Shaver Resources Co.

Tyler, TX · P-5 Y, filed Feb 4, 2026 · 201 permits on file · (903) 593-5221

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBarrow-Shaver Resources Co.
Production reportsBarrow-Shaver Resources Co.through Apr 2026
Latest permitBarrow-Shaver Resources Co.Jul 15, 2011
15,000
total depth, ft
2
permits on file
Jul 15, 2011
last permit issued
Sep 3, 2010
completed
0
cumulative oil, bbl
1.17M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2008 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 3, 2010
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Studdard Steward "M" G-5-251089WildcatBarrow-Shaver Resources Co.101.17MOct 2008 – Jul 2026

Gas, mcf lease total

Last 12 months 50,227 · prior 12 65,748(-24%)

05K10K15K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Barrow-Shaver Resources Co.Sep 2010 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
715938-99RecompletionBarrow-Shaver Resources Co.May 9, 2011Jul 15, 2011Apr 27, 201014,495
656283-99DrillMarathon Oil CompanyFeb 28, 2008Mar 7, 2008Aug 18, 200815,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-5-251089————

Formation tops

As filed on W-2/G-1. Subsea from 480 ft elevation.Download CSV →

FormationMD ftSubsea
Glhrs6,940-6,460
Pet9,120-8,640
Boss13,220-12,740

Perforations

Perforated and open-hole intervals.

FromToType
13,60113,609Perforated
13,62513,646Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6255,60512.251,868 S
9.6255,60612.251,868 S
713,1508.751,347 S
4.514,4946127 S
4.514,4956127 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 8, 2012Jul 25, 2011Yes
00Nov 10, 2009May 6, 2009Yes
00Sep 25, 2009——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16134095, documented in the API reference.