WELL · 42-163-00244 · DISTRICT 1
Burns Jane -C- #3-I
Frio County · Big Foot field · Vertical
Burns Jane -C- #3-I (API 42-163-00244) is a well in Frio County operated by Watson Energy Investments LLC, completed October 13, 1978.
The RRC has issued one drilling permit, issued April 3, 1978, permitted to 3,733 ft.
It was permitted by Shell Oil Company and has since transferred to Watson Energy Investments LLC on the wellbore schedule.
Its lease has reported 124K barrels of oil and 54.9K mcf of gas since January 1993, last reporting in July 2026. The lease carries 18 wells, so these are lease totals, not this well alone.
It holds an active disposal or injection permit.
Operator of record
Permitted by Shell Oil Company; the EWA schedule now lists a different operator.
Tulsa, OK · P-5 Y, filed Apr 4, 2026 · 1 permits on file · (210) 705-0740
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Watson Energy Investments LLC |
| Production reports | Watson Energy Investments, LLCthrough Jul 2022 |
| Latest permit | Shell Oil CompanyApr 3, 1978 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,733
- total depth, ft
- 1
- permits on file
- Apr 3, 1978
- last permit issued
- Oct 13, 1978
- completed
- 124K
- cumulative oil, bbl
- 54.9K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 13, 1978
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 18 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Burns, Jane -C- O-1-91 | Big Foot | Watson Energy Investments, LLC | 18 | 124K | 54.9K | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1HCMJan 1993 → Dec 2003
- 2Maverick Energy Group, LLCJan 2004 → Apr 2005
- 3Maverick Energy Group, Inc.May 2005 → Apr 2012
- 4White Oak Operating Company LLCMay 2012 → Oct 2013
- 5Jenex Petroleum CorporationNov 2013 → Jun 2017
- 6Watson Energy Investments, LLCJun 2018 → Jul 2022
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 21295-99 | Other | Shell Oil Company | Apr 3, 1978 | Apr 3, 1978 | — | 3,733 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-1-91 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,370 | 3,390 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 113 | — | 100 S |
| 7 | 378 | — | 350 S |
| 2.375 | 3,308 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Mar 12, 1979 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-163-00244 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-163-00244 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 18.4K
- bbl, all reported
- Feb 2024
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000000050 | H-1 Injection | Active | 100 | 1,400 | 3,370–3,390 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/16300244, documented in the API reference.