WELL · 42-163-31511 · DISTRICT 1

Shiner Ranch A #201

Plugged

Frio County · Pearsall (Austin Chalk) field  · Vertical

Shiner Ranch A #201 (API 42-163-31511) is a plugged well in Frio County, plugged March 12, 1998, last operated by Ginco Operating CO..

The RRC has issued 2 drilling permits between 1977 and 2006, permitted to 8,000 ft.

It was permitted by Blackbrush O & G, Inc. and has since transferred to Ginco Operating CO. on the wellbore schedule.

Completion filings report 2 formation tops, including Austin Chalk, Buda.

Its 2 leases have reported 422 barrels of oil and 11 mcf of gas since January 1993, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Ginco Operating Co.

Permitted by Blackbrush O & G, Inc.; the EWA schedule now lists a different operator.

San Antonio, TX · P-5 Y, filed Nov 4, 2025 · 4 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleGinco Operating Co.
Production reportsBlackbrush O & G, LLCthrough Dec 2024
Latest permitBlackbrush O & G, Inc.Apr 10, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,000
total depth, ft
2
permits on file
Apr 10, 2006
last permit issued
Nov 30, 1977
completed
422
cumulative oil, bbl
11
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 30, 1977
Shut in
—
Plugged
Mar 12, 1998

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Shiner Ranch "A" O-1-5726Pearsall (Austin Chalk)Ginco Operating Co.1772Jan 1993 – Jul 2026
Shiner Ranch "A" O-1-14890Pearsall (Buda Lime)Blackbrush O & G, LLC13459Dec 2007 – Jul 2026

Oil, barrels lease total

Last 12 months 0 · prior 12 9(-100%)

0123202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Penrod Oil Company of Texas, IncAug 1994 → Sep 1994
  2. 2Mobile Production Systems, Inc.Oct 1994 → Oct 1994
  3. 3Ginco Operating Co.Jun 1995 → Oct 1995
  4. 4Blackbrush O & G, Inc.Dec 2007 → Jun 2009
  5. 5Blackbrush O & G, LLCDec 2019 → Dec 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
617256-99ReenterBlackbrush O & G, Inc.Apr 7, 2006Apr 10, 2006Apr 18, 20068,000
8492-99DrillGetty Oil Co.Sep 27, 1977Sep 27, 1977Oct 18, 19777,710

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-5726————
—— O-1-14890————

Formation tops

As filed on W-2/G-1. Subsea from 503 ft elevation.Download CSV →

FormationMD ftSubsea
Austin Chalk7,034-6,531
Buda7,590-7,087

Perforations

Perforated and open-hole intervals.

FromToType
7,5907,685Perforated
7,6077,674Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62542312.25300 S
2.8757,494——
5.57,7007.875350 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 21, 2008Jan 30, 2008Yes
00Feb 4, 2008——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16331511, documented in the API reference.