WELL · 42-163-31886 · DISTRICT 1

Nixon-Dillard #1

Plugged

Frio County · Pearsall (Austin Chalk) field  · Vertical

Nixon-Dillard #1 (API 42-163-31886) is a plugged well in Frio County, plugged May 22, 1986, last operated by Fair Energy.

The RRC has issued one drilling permit, issued December 3, 1980, permitted to 7,400 ft.

Completion filings report 3 formation tops, including Olmos, Austin Chalk, Buda.

Operator of record

Fair Energy

Tyler, TX · P-5 Y, filed Jan 5, 1996 · 65 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleFair Energy
Production reportsnone
Latest permitFair EnergyDec 3, 1980
7,400
total depth, ft
1
permits on file
Dec 3, 1980
last permit issued
Mar 14, 1984
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 14, 1984
Shut in
—
Plugged
May 22, 1986

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
100775-99DrillFair EnergyDec 3, 1980Dec 3, 1980—7,400

Formation tops

As filed on W-2/G-1. Subsea from 558 ft elevation.Download CSV →

FormationMD ftSubsea
Olmos5,217-4,659
Austin Chalk6,730-6,172
Buda7,330-6,772

Perforations

Perforated and open-hole intervals.

FromToType
6,8527,006Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62550912.25350 S
4.57,4757.8751,325 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 19, 1985Feb 5, 1985—
00Feb 15, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16331886, documented in the API reference.