WELL · 42-163-31985 · DISTRICT 1

Beever/Little #B 1H

Plugged

Frio County · Pearsall (Austin Chalk) field  · Horizontal · Sidetrack

Beever/Little #B 1H (API 42-163-31985) is a plugged horizontal well in Frio County, plugged November 8, 2004, last operated by Texan Production Company Inc..

The RRC has issued 2 drilling permits (amended once) between 1981 and 1991, permitted to 8,000 ft.

It was permitted by Tularosa Operating Company and has since transferred to Texan Production Company Inc. on the wellbore schedule.

Completion filings report one formation top, including Austin Chalk.

Its lease has reported 83.6K barrels of oil and 61.2K mcf of gas since January 1993, last reporting in July 2026. The lease carries 7 wells, so these are lease totals, not this well alone.

Operator of record

Texan Production Company Inc.

Permitted by Tularosa Operating Company; the EWA schedule now lists a different operator.

Canyon Lake, TX · P-5 Y, filed Jan 14, 2023 · 2 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTexan Production Company Inc.
Production reportsTexan Production Company, Inc.through Mar 1999
Latest permitTularosa Operating CompanyApr 12, 1991

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,000
total depth, ft
3
permits on file
Apr 12, 1991
last permit issued
Jan 2, 1992
completed
83.6K
cumulative oil, bbl
61.2K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 2, 1992
Shut in
—
Plugged
Nov 8, 2004

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 7 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Beever/Little O-1-8218Pearsall (Austin Chalk)Texan Production Company, Inc.783.6K61.2KJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Tularosa Operating CompanyJan 1993 → Mar 1995
  2. 2Texan ProductionApr 1995 → Sep 1995
  3. 3Texan Production Company, Inc.Oct 1995 → Mar 1999

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
386738-98Recompletion · sidetrackTularosa Operating CompanyMar 23, 1992Apr 12, 1991—6,769
386738-99Recompletion · sidetrackTularosa Operating CompanyApr 12, 1991Apr 12, 1991Apr 12, 19918,000
116677-99DrillCrown Production Co., Inc.May 1, 1981May 1, 1981May 20, 19816,300

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-8218————
—— O-1-8218————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Austin Chalk5,501

Perforations

Perforated and open-hole intervals.

FromToType
5,2995,725Perforated
5,5016,769Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62535012.25175 S
2.3755,200——
75,2998.751,000 S
5.5———

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 7, 1992Jan 7, 1992Yes
00Mar 9, 1992Jul 21, 1982—
00Jan 12, 1984Jul 21, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16331985, documented in the API reference.