WELL · 42-163-32071 · DISTRICT 1

Nixon-Dillard #3

Plugged

Frio County · Pearsall (Austin Chalk) field  · Vertical

Nixon-Dillard #3 (API 42-163-32071) is a plugged well in Frio County, plugged June 27, 1986, last operated by Fair Energy.

The RRC has issued one drilling permit, issued November 9, 1981, permitted to 7,500 ft.

Completion filings report 3 formation tops, including Olmos, Anacacho, Austin Chalk.

Operator of record

Fair Energy

Tyler, TX · P-5 Y, filed Jan 5, 1996 · 65 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleFair Energy
Production reportsnone
Latest permitFair EnergyNov 9, 1981
7,500
total depth, ft
1
permits on file
Nov 9, 1981
last permit issued
Apr 30, 1984
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 30, 1984
Shut in
—
Plugged
Jun 27, 1986

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
140052-99DrillFair EnergyNov 9, 1981Nov 9, 1981Nov 13, 19817,500

Formation tops

As filed on W-2/G-1. Subsea from 566 ft elevation.Download CSV →

FormationMD ftSubsea
Olmos5,280-4,714
Anacacho6,415-5,849
Austin Chalk6,876-6,310

Perforations

Perforated and open-hole intervals.

FromToType
6,9007,584Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62553312.25350 S
5.56,9007.8751,150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 19, 1985Feb 5, 1985—
00Feb 15, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16332071, documented in the API reference.