WELL · 42-163-32327 · DISTRICT 1

Burleson "B" #2H

N

Frio County  · Horizontal

Burleson "B" #2H (API 42-163-32327) is a permitted horizontal well in Frio County filed by Pedeco, Inc.; no completion report is on file yet.

The RRC has issued 3 drilling permits between 1984 and 1998, permitted to 8,000 ft.

Completion filings report one formation top, including Austin Chalk.

Operator of record

Pedeco, Inc.

Casper, WY · P-5 Y, filed Jun 10, 2005 · 170 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitPedeco, Inc.Sep 1, 1998
8,000
total depth, ft
3
permits on file
Sep 1, 1998
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
479181-99ReenterPedeco, Inc.Sep 1, 1998Sep 1, 1998—8,000
370254-99ReenterBankers Investment Group, Inc.Feb 26, 1990Feb 28, 1990—6,200
242493-99DrillTaylor, M. W. Inc.Jun 18, 1984Jun 20, 1984—6,200

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Austin Chalk5,535

Perforations

Perforated and open-hole intervals.

FromToType
5,5145,914Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62534512.25225 S
5.55,5147.875880 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 4, 1984Nov 12, 1984—
00Nov 21, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16332327, documented in the API reference.