WELL · 42-163-32676 · DISTRICT 1
Pettit #1
Frio County · Pearsall (Austin Chalk) field · Horizontal
Pettit #1 (API 42-163-32676) is a plugged horizontal well in Frio County, plugged January 13, 2004, last operated by Ginco Operating CO..
The RRC has issued one drilling permit (amended once), issued March 16, 1990, permitted to 6,600 ft.
It was permitted by Tide West Oil Company and has since transferred to Ginco Operating CO. on the wellbore schedule.
Completion filings report one formation top, including A.C..
Its lease has reported 2.74K barrels of oil and 17 mcf of gas since January 1993, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Tide West Oil Company; the EWA schedule now lists a different operator.
San Antonio, TX · P-5 Y, filed Nov 4, 2025 · 4 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Ginco Operating Co. |
| Production reports | Ginco Operating Co.through Oct 1995 |
| Latest permit | Tide West Oil CompanyMar 16, 1990 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,600
- total depth, ft
- 2
- permits on file
- Mar 16, 1990
- last permit issued
- May 17, 1990
- completed
- 2.74K
- cumulative oil, bbl
- 17
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 17, 1990
- Shut in
- —
- Plugged
- Jan 13, 2004
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Pettit O-1-7815 | Pearsall (Austin Chalk) | Ginco Operating Co. | 2 | 2.74K | 17 | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Tide West Oil CompanyJan 1993 → Feb 1994
- 2Horizon Natural Resources, Inc.Mar 1994 → Apr 1994
- 3Senora Resources, Inc.Dec 1994 → Jan 1995
- 4Ginco Operating Co.Sep 1995 → Oct 1995
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 371069-98 | Drill | Tide West Oil Company | Jul 13, 1992 | Mar 16, 1990 | — | 6,300 |
| 371069-99 | Drill | Sandia Energy Corporation-NM | Mar 16, 1990 | Mar 16, 1990 | Mar 21, 1990 | 6,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-1-7815 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,030 | 6,282 | Open hole |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 668 | 12.25 | 231 S |
| 5.5 | 5,800 | 7.875 | 300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 28, 1991 | Sep 10, 1990 | Yes |
| 00 | Jan 10, 1991 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-163-32676 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-163-32676 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/16332676, documented in the API reference.