WELL · 42-163-32760 · DISTRICT 1

New Wittman #1

Y

Frio County · Pearsall (Austin Chalk) field · Injection  · Horizontal

New Wittman #1 (API 42-163-32760) is a horizontal well in Frio County operated by Rclj Construction Inc., completed September 24, 2012 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued June 22, 1990, permitted to 6,500 ft.

It was permitted by Kinlaw Oil Corporation and has since transferred to Rclj Construction Inc. on the wellbore schedule.

Completion filings report 3 formation tops, including Olmos, San Miguel, Austin Chalk.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit, with 564K barrels injected in the 12 months reported through February 2026.

Operator of record

Rclj Construction Inc.

Permitted by Kinlaw Oil Corporation; the EWA schedule now lists a different operator.

Big Wells, TX · P-5 Y, filed Jun 4, 2026 · 1 permits on file · (830) 457-2206

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRclj Construction Inc.
Production reportsnone
Latest permitKinlaw Oil CorporationJun 22, 1990

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,500
total depth, ft
1
permits on file
Jun 22, 1990
last permit issued
Sep 24, 2012
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 24, 2012
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
New Wittman O-1-12731Pearsall (Austin Chalk)Rclj Construction, Inc.100Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
374754-99DrillKinlaw Oil CorporationJun 22, 1990Jun 22, 1990Jun 27, 19906,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-12731————

Formation tops

As filed on W-2/G-1. Subsea from 513 ft elevation.Download CSV →

FormationMD ftSubsea
Olmos4,658-4,145
San Miguel5,168-4,655
Austin Chalk6,125-5,612

Perforations

Perforated and open-hole intervals.

FromToType
4,6805,192Perforated
6,4707,370Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.7566014.75430 S
75,8149.875350 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 26, 2023Jan 12, 2023—
00Mar 17, 2008Mar 2, 2007—
00Oct 8, 1991Sep 12, 1991—
00Dec 18, 1990Sep 18, 1990Yes
00Nov 30, 1990——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

564K
bbl, last 12 reported months
22.4M
bbl, all reported
Feb 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000074463W-14 DisposalActive10,0002,3004,650–5,240

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 563,522 · prior 12 192,830(+192%)

050K100K20252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16332760, documented in the API reference.