WELL · 42-163-33236 · DISTRICT 1

Melms Estate #10

Plugged

Frio County · Pearsall (Navarro Sand) field  · Vertical

Melms Estate #10 (API 42-163-33236) is a plugged well in Frio County, plugged August 18, 2023, last operated by Bigfoot Oil LLC.

The RRC has issued one drilling permit, issued January 24, 1997, permitted to 3,990 ft.

It was permitted by Texan Production Company, Inc. and has since transferred to Bigfoot Oil LLC on the wellbore schedule.

Completion filings report one formation top, including Navarro.

Its lease has reported 155K barrels of oil and 8.6K mcf of gas since January 1993, last reporting in July 2026. The lease carries 4 wells, so these are lease totals, not this well alone.

Operator of record

Bigfoot Oil LLC

Permitted by Texan Production Company, Inc.; the EWA schedule now lists a different operator.

Denver, CO · P-5 Y, filed Apr 4, 2026 · 10 permits on file · (303) 570-4447

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBigfoot Oil LLC
Production reportsBigfoot Oil LLCthrough Mar 2026
Latest permitTexan Production Company, Inc.Jan 24, 1997

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,990
total depth, ft
1
permits on file
Jan 24, 1997
last permit issued
Jul 1, 2017
completed
155K
cumulative oil, bbl
8.6K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 1, 2017
Shut in
—
Plugged
Aug 18, 2023

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Melms Estate O-1-8013Pearsall (Navarro Sand)Bigfoot Oil LLC4155K8.6KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 1,577 · prior 12 2,954(-47%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mariah Energy Corp.Jan 1993 → Jan 1996
  2. 2Texan Production Company, Inc.Mar 1996 → Jun 2001
  3. 3Crest Engineering Services,inc.Jul 2001 → Dec 2003
  4. 4Jenex Petroleum CorporationJan 2004 → Aug 2016
  5. 5Jenco Petroleum CorporationSep 2016 → Apr 2017
  6. 6Bigfoot Oil LLCSep 2017 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
457812-99DrillTexan Production Company, Inc.Jan 24, 1997Jan 24, 1997Feb 2, 19973,990

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-8013————

Formation tops

As filed on W-2/G-1. Subsea from 556 ft elevation.Download CSV →

FormationMD ftSubsea
Navarro3,907-3,351

Perforations

Perforated and open-hole intervals.

FromToType
3,9003,978Perforated
3,9073,911Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.53,9787.875596 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 20, 2020Nov 6, 2019—
00Jul 23, 2001Jan 23, 1998Yes
00May 30, 2001——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
667K
bbl, all reported
Feb 2023
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000095301H-1 InjectionPlugged Sep 1, 20235001,9503,900–3,978

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 151,800(-100%)

05K10K15K20222023

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16333236, documented in the API reference.