WELL · 42-163-33427 · DISTRICT 1
Pearsall T J #1H
Frio County · Eagleville (Eagle Ford) field · Horizontal
Pearsall T J #1H (API 42-163-33427) is a horizontal well in Frio County operated by El Paso E & P Company L. P., completed October 7, 2010.
The RRC has issued one drilling permit, issued August 27, 2010, permitted to 12,000 ft.
Completion filings report 7 formation tops, including Anacacho, Ancc, Astn, Austin Chalk.
Its 2 leases have reported 33.2K barrels of oil and 1.77K mcf of gas since October 2010, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Houston, TX · P-5 Inactive, filed May 8, 2012 · 582 permits on file · (713) 420-7557
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | EL Paso E & P Company L. P. |
| Production reports | Blackbrush O & G, LLCthrough Apr 2026 |
| Latest permit | EL Paso E & P Company, L. P.Aug 27, 2010 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 12,000
- total depth, ft
- 1
- permits on file
- Aug 27, 2010
- last permit issued
- Oct 7, 2010
- completed
- 33.2K
- cumulative oil, bbl
- 1.77K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 2010 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 7, 2010
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Pearsall, T J O-1-15545 | Eagleville (Eagle Ford-1) | Blackbrush O & G, LLC | 1 | 33.2K | 1.77K | Dec 2010 – Jul 2026 |
| Pearsall, T J O-2-9652 | Eagleville (Eagle Ford) | EL Paso E & P Company, L. P. | 1 | 0 | 0 | Oct 2010 – Jun 2012 |
Oil, barrels lease total
Last 12 months 875 · prior 12 978(-11%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1EL Paso E & P Company, L. P.Mar 2011 → Aug 2011
- 2Blackbrush O & G, LLCMay 2012 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 701234-99 | Drill | EL Paso E & P Company, L. P. | Aug 25, 2010 | Aug 27, 2010 | Sep 6, 2010 | 12,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-1-15545 | — | — | — | — |
| — | — O-2-9652 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 585 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Anacacho | 5,758 | -5,173 |
| Ancc | 5,758 | -5,173 |
| Astn | 6,105 | -5,520 |
| Austin Chalk | 6,110 | -5,525 |
| Eagle Ford | 6,469 | -5,884 |
| Egfd | 6,470 | -5,885 |
| Buda | 6,632 | -6,047 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,965 | 10,680 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 20 | 85 | 20 | — |
| 20 | 85 | — | — |
| 10.75 | 2,500 | 14.75 | 1,590 S |
| 5.5 | 10,851 | 9.875 | 2,565 S |
| 5 | 10,851 | 9.875 | 2,565 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 8, 2012 | Sep 14, 2011 | — |
| 00 | Feb 7, 2012 | Feb 4, 2011 | Yes |
| 00 | Dec 7, 2011 | Feb 4, 2011 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-163-33427 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-163-33427 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/16333427, documented in the API reference.