WELL · 42-165-00165 · DISTRICT 8
Norman A #1
Gaines County · Horizontal
Norman A #1 (API 42-165-00165) is a permitted horizontal well in Gaines County filed by Oxy USA Inc.; no completion report is on file yet.
The RRC has issued 2 drilling permits between 1997 and 2013, permitted to 10,300 ft.
Its 2 leases have reported 355K barrels of oil and 87.1K mcf of gas since January 1993, last reporting in July 2026. The leases carry 7 wells, so these are lease totals, not this well alone.
Operator of record
Houston, TX · P-5 Y, filed Dec 4, 2025 · 3,316 permits on file · (713) 215-7000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | OXY USA WTP LPthrough Apr 2026 |
| Latest permit | OXY USA Inc.Jul 18, 2013 |
- 10,300
- total depth, ft
- 2
- permits on file
- Jul 18, 2013
- last permit issued
- —
- completed
- 355K
- cumulative oil, bbl
- 87.1K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 7 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Norman "A" O-10-22990 | Norman (Devonian) | Hilcorp Energy Company | 6 | 103K | 2.96K | Jan 1993 – Jul 2026 |
| Norman A O-10-35328 | Norman(canyon) | Hilcorp Energy Company | 1 | 253K | 84.1K | May 1997 – Jul 2026 |
Oil, barrels lease total
Last 12 months 3,867 · prior 12 2,675(+45%)
Gas, mcf lease total
Last 12 months 273 · prior 12 513(-47%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1OXY USA Inc.Jan 1993 → Dec 2000
- 2OXY USA WTP LPJan 2001 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 765857-99 | Recompletion | OXY USA Inc. | Jul 2, 2013 | Jul 18, 2013 | — | 10,300 |
| 458255-99 | Recompletion | OXY USA Inc. | Feb 6, 1997 | Mar 25, 1997 | Apr 2, 1997 | 10,280 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-22990 | — | — | — | — |
| — | — O-10-35328 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,270 | 10,285 | Perforated |
| — | 12,226 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 370 | 17.5 | 350 S |
| 13.375 | 370 | — | 350 S |
| 12.375 | 370 | — | — |
| 9.625 | 5,062 | 12.25 | 750 S |
| 9.625 | 5,062 | — | — |
| 5.5 | 12,216 | 7.875 | 1,000 S |
| 5.5 | 12,226 | — | 1,050 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 1, 1997 | May 14, 1997 | Yes |
| 00 | Jun 5, 1997 | — | — |
| 00 | Dec 29, 1989 | Nov 21, 1989 | — |
| 00 | Jan 12, 1984 | Nov 6, 1961 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-165-00165 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-165-00165 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/16500165, documented in the API reference.