WELL · 42-165-03006 · DISTRICT 8

Riley, T. S. Estate B #5H

N

Gaines County  · Horizontal

Riley, T. S. Estate B #5H (API 42-165-03006) is a permitted horizontal well in Gaines County filed by Xto Energy Inc.; no completion report is on file yet.

The RRC has issued 3 drilling permits between 2003 and 2010, permitted to 12,000 ft.

Completion filings report 9 formation tops, including L/Clearfork, Clear Fork, Wolfcamp, Pennsylvanian.

Its lease has reported 1.22M barrels of oil and 218K mcf of gas since January 1993, last reporting in July 2026. The lease carries 14 wells, so these are lease totals, not this well alone.

Operator of record

XTO Energy Inc.

Spring, TX · P-5 Y, filed Feb 4, 2026 · 16,156 permits on file · (832) 625-1100

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitXTO Energy Inc.Jul 13, 2010
12,000
total depth, ft
3
permits on file
Jul 13, 2010
last permit issued
—
completed
1.22M
cumulative oil, bbl
218K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 14 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Riley, T. S. Estate "B" O-11-8449Russell, North (Devonian)Hilcorp Energy Company141.22M218KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 4,109 · prior 12 4,212(-2%)

0200400600202420252026

Gas, mcf lease total

Last 12 months 2,242 · prior 12 2,079(+8%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Jan 1993 → Aug 1993
  2. 2Maynard Oil Co.Sep 1993 → May 2003
  3. 3Platinum Exploration Inc.Jun 2003 → Nov 2005
  4. 4XTO Energy Inc.Dec 2005 → Mar 2025
  5. 5Hilcorp Energy CompanyApr 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
698795-99RecompletionXTO Energy Inc.Jul 9, 2010Jul 13, 2010Jul 15, 201011,000
619551-99RecompletionXTO Energy Inc.May 18, 2006Jul 11, 2006Aug 8, 200712,000
535175-99RecompletionPlatinum Exploration Inc.Aug 11, 2003Aug 14, 2003Jul 22, 200312,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-8449————
—— O-11-8449————

Formation tops

As filed on W-2/G-1. Subsea from 3,533 ft elevation.Download CSV →

FormationMD ftSubsea
L/Clearfork8,065-4,532
Clear ForkLOWER CLEARFORK8,065-4,532
Wolfcamp9,474-5,941
Wolfcamp9,475-5,942
Pennsylvanian9,908-6,375
Pennyslvanian9,908-6,375
Mississippian10,264-6,731
Mississippian10,265-6,732
Woodford10,819-7,286
Woodford10,824-7,291
Wooford10,824-7,291
Devonian10,905-7,372
Devonian10,908-7,375

Perforations

Perforated and open-hole intervals.

FromToType
10,57512,647Open hole
10,59612,177Open hole
10,90811,094Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37537617.5500 S
8.6254,940113,200 S
5.510,9087.8751,020 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 3, 2018Oct 23, 2017—
00Jan 14, 2011Sep 14, 2010Yes
00Oct 1, 2008Jun 9, 2008Yes
00Jul 11, 2008Oct 21, 2003Yes
00May 18, 2004Oct 21, 2003Yes
00Apr 29, 2004——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16503006, documented in the API reference.