WELL · 42-165-34749 · DISTRICT 8

San Salvador A #2

Y

Gaines County · Adair field · Injection  · Vertical

San Salvador A #2 (API 42-165-34749) is a well in Gaines County operated by Retriever Operating LLC, completed April 10, 1995 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued June 17, 1994, permitted to 5,000 ft.

It was permitted by Remuda Operating Company and has since transferred to Retriever Operating LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Anahydrite, Grayburg, San Andres.

Its lease has reported 107K barrels of oil and 134 mcf of gas since February 1994, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 13.8K barrels injected in the 12 months reported through October 2025.

Operator of record

Retriever Operating LLC

Permitted by Remuda Operating Company; the EWA schedule now lists a different operator.

Midland, TX · P-5 Y, filed Jun 4, 2026 · (713) 898-6295

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRetriever Operating LLC
Production reportsRemuda Operating Companythrough Mar 2026
Latest permitRemuda Operating CompanyJun 17, 1994

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,000
total depth, ft
1
permits on file
Jun 17, 1994
last permit issued
Apr 10, 1995
completed
107K
cumulative oil, bbl
134
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 1994 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 10, 1995
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
San Salvador "A" O-11-67211AdairRetriever Operating LLC2107K134Feb 1994 – Jul 2026

Oil, barrels lease total

Last 12 months 1,406 · prior 12 1,334(+5%)

0100200202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Remuda Operating CompanyFeb 1994 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
424827-99DrillRemuda Operating CompanyJun 13, 1994Jun 17, 1994Jun 18, 19945,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-67211————

Formation tops

As filed on W-2/G-1. Subsea from 3,181 ft elevation.Download CSV →

FormationMD ftSubsea
Anahydrite2,1301,051
Grayburg4,362-1,181
San Andres4,820-1,639

Perforations

Perforated and open-hole intervals.

FromToType
4,8264,867Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62533812.25220 S
4.54,8707.875275 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 27, 1995Apr 27, 1995Yes
00Dec 6, 1995——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

13.8K
bbl, last 12 reported months
837K
bbl, all reported
Oct 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000081931H-1 InjectionActive3002,4004,826–4,857

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 13,847 · prior 12 14,706(-6%)

05001K1.5K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.