WELL · 42-165-35770 · DISTRICT 8

North Robertson Unit #3545

Y

Gaines County · Robertson N. (Clear Fork 7100) field · Producing  · Vertical

North Robertson Unit #3545 (API 42-165-35770) is a well in Gaines County operated by Bce-Mach Iii LLC, completed September 11, 2001 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued July 20, 2001, permitted to 7,350 ft.

It was permitted by First Permian, L.L.C. and has since transferred to Bce-Mach Iii LLC on the wellbore schedule.

Completion filings report one formation top, including Clear Fork.

Its lease has reported 25.7M barrels of oil and 12.1M mcf of gas since January 1993, last reporting in July 2026. The lease carries 562 wells, so these are lease totals, not this well alone.

Operator of record

Bce-Mach III LLC

Permitted by First Permian, L.L.C.; the EWA schedule now lists a different operator.

Oklahoma City, OK · P-5 Y, filed Mar 4, 2026 · 10 permits on file · (833) 831-2164

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBce-Mach III LLC
Production reportsBce-Mach III LLCthrough Apr 2026
Latest permitFirst Permian, L.L.C.Jul 20, 2001

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,350
total depth, ft
1
permits on file
Jul 20, 2001
last permit issued
Sep 11, 2001
completed
25.7M
cumulative oil, bbl
12.1M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 11, 2001
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 562 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
North Robertson Unit O-11-65930Robertson, N. (Clear Fork 7100)Bce-Mach III LLC56225.7M12.1MJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 287,429 · prior 12 317,107(-9%)

020K40K202420252026

Gas, mcf lease total

Last 12 months 150,001 · prior 12 149,491(+0%)

05K10K15K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Fina Oil & Chemical CompanyJan 1993 → May 1999
  2. 2First Permian, L.L.C.Jun 1999 → Apr 2002
  3. 3Energen Resources CorporationMay 2002 → Jan 2019
  4. 4Diamondback E&P LLCFeb 2019 → Jun 2019
  5. 5Sabinal Energy Operating, LLCJul 2019 → Aug 2025
  6. 6Bce-Mach III LLCSep 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
511651-99DrillFirst Permian, L.L.C.Jul 20, 2001Jul 20, 2001Jul 23, 20017,350

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-65930————

Formation tops

As filed on W-2/G-1. Subsea from 3,411 ft elevation.Download CSV →

FormationMD ftSubsea
Clear ForkUPPER CLEARFORK6,378-2,967
Clear ForkMIDDLE CLEARFORK6,672-3,261
Clear ForkLOWER CLEARFORK7,171-3,760

Perforations

Perforated and open-hole intervals.

FromToType
6,3786,504Perforated
6,6726,987Perforated
7,1717,251Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,84212.25900 S
5.57,3587.8751,860 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 30, 2002Oct 22, 2001Yes
00Apr 11, 2002——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16535770, documented in the API reference.