WELL · 42-167-01158 · DISTRICT 3
South Gillock #1
Galveston County · Directional
South Gillock #1 (API 42-167-01158) is a former disposal or injection well in Galveston County, last operated by Transatlantic Petr (USA) Corp.; its UIC permit is no longer active.
The RRC has issued 2 drilling permits (amended once) between 1994 and 2006, permitted to 8,280 ft.
Operator of record
Transatlantic Petr (USA) Corp.
Dallas, TX · P-5 Y, filed May 4, 2026 · 9 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Amx Energy, Inc.through Nov 2004 |
| Latest permit | Transatlantic Petr (USA) Corp.Jan 4, 2006 |
- 8,280
- total depth, ft
- 3
- permits on file
- Jan 4, 2006
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 967K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| South Gillock Unit G-3-149112 | Gillock, South (Frio Top 7500) | Promise Energy Operations, LLC | 1 | 0 | 967K | Apr 1994 – Jul 2026 |
| Gillock, South Unit G-3-6405 | Gillock, South | MW Petroleum Corporation | 1 | 0 | 0 | Jan 1993 – Apr 1994 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1MW Petroleum CorporationApr 1994 → Jan 1997
- 2McGowan Working PartnersFeb 1997 → Apr 2000
- 3McGowan Working Partners, Inc.May 2000 → Aug 2001
- 4Amx Energy, Inc.Jan 2003 → Nov 2004
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 611686-98 | Recompletion | Transatlantic Petr (USA) Corp. | Mar 29, 2006 | Jan 4, 2006 | — | 8,280 |
| 611686-99 | Recompletion | Transatlantic Petr (USA) Corp. | Dec 28, 2005 | Jan 4, 2006 | — | 8,280 |
| 422345-99 | Recompletion | MW Petroleum Corporation | Mar 23, 1994 | Apr 21, 1994 | Jan 6, 1994 | 7,660 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-6405 | — | — | — | — |
| — | — G-3-149112 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,632 | 7,647 | Perforated |
| 7,742 | 7,755 | Perforated |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 22, 2007 | Sep 21, 2006 | — |
| 00 | May 17, 1994 | Apr 22, 1994 | Yes |
| 00 | May 12, 1994 | — | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-167-01158 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-167-01158 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- Jan 1992
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000039250 | UIC Permit | Canceled Sep 10, 1992 | 0 | 0 | 0–0 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/16701158, documented in the API reference.