WELL · 42-167-01649 · DISTRICT 3

Stewart, Maco "A" #13

N

Galveston County  · Vertical

Stewart, Maco "A" #13 (API 42-167-01649) is a former disposal or injection well in Galveston County, last operated by Smith Energy 1986a Partnership; its UIC permit is no longer active.

The RRC has issued 2 drilling permits between 1980 and 1997, permitted to 9,000 ft.

Completion filings report one formation top, including Intermediate.

Its 3 leases have reported 105K barrels of oil and 733K mcf of gas since January 1993, last reporting in July 2026. The leases carry 19 wells, so these are lease totals, not this well alone.

Operator of record

Smith Energy 1986A Partnership

Alvin, TX · P-5 Y, filed Jan 8, 2010 · 15 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsGcows Operating LLCthrough Apr 2026
Latest permitSmith Energy 1986A PartnershipJun 10, 1997
9,000
total depth, ft
2
permits on file
Jun 10, 1997
last permit issued
—
completed
105K
cumulative oil, bbl
733K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 19 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Stewart, Maco /a/ 390 O-3-1633Gillock (Big Gas)Gcows Operating LLC11105K732KJan 1993 – Jul 2026
Stewart, Maco "A" O-3-23251GillockDenbury Onshore, LLC20986Nov 1996 – Oct 2013
Stewart, Maco /A/ O-3-1612GillockDenbury Onshore, LLC600Jan 1993 – Apr 2012

Oil, barrels lease total

Last 12 months 1,580 · prior 12 3,631(-56%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Smith Energy 1986A PartnershipJan 1993 → Dec 2009
  2. 2Cliffwood Production Co.Dec 1998 → Feb 1999
  3. 3Sawtooth Operating Co., Inc.Mar 2017 → Feb 2024
  4. 4Gcows Operating LLCApr 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
460617-99RecompletionSmith Energy 1986A PartnershipApr 2, 1997Jun 10, 1997—9,000
83709-99RecompletionArco Oil & Gas Co.Jun 2, 1980Jun 2, 1980—8,659

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-1612————
—— O-3-1633————
—— O-3-23251————

Formation tops

As filed on W-2/G-1. Subsea from 18 ft elevation.Download CSV →

FormationMD ftSubsea
Intermediate8,603-8,585

Perforations

Perforated and open-hole intervals.

FromToType
8,6038,628Perforated
—8,543Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
1676—125 S
10.752,58112.25450 S
10.752,581—450 S
2.8758,448——
6.6258,6519.875500 S
6.6258,651—500 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 14, 1998Jan 30, 1998—
00Jul 24, 1997Jan 19, 1981—
00Jan 12, 1984Jan 19, 1981—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
639K
bbl, all reported
Oct 2004
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000086945H-1 InjectionPlugged Feb 7, 20053,0001,3008,603–8,628

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 88,200(-100%)

05K10K15K20032004

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16701649, documented in the API reference.