WELL · 42-169-30944 · DISTRICT 8
Spining, George W. et AL #1
Garza County · Vertical
Spining, George W. ET AL #1 (API 42-169-30944) is a plugged well in Garza County, plugged August 15, 1978, last operated by Traverse Corp..
The RRC has issued 2 drilling permits in 1978, permitted to 8,125 ft.
Operator of record
Traverse City, MI · P-5 Y, filed Sep 15, 1982 · 10 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | Traverse Corp.Nov 7, 1978 |
- 8,125
- total depth, ft
- 2
- permits on file
- Nov 7, 1978
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Aug 15, 1978
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| — O-11-62353 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 36359-99 | Other | Traverse Corp. | Nov 7, 1978 | Nov 7, 1978 | — | 8,125 |
| 27051-99 | Drill | NRM Petroleum Corp. | Jun 22, 1978 | Jun 22, 1978 | Jul 26, 1978 | 8,125 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-11-62353 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| — | 3,830 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 12.75 | 325 | 17.5 | 475 S |
| 8.625 | 2,020 | — | 400 S |
| 5.5 | 3,950 | — | 300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Jan 8, 1979 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-169-30944 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-169-30944 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 433K
- bbl, all reported
- Aug 1990
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000022409 | W-14 Disposal | Plugged Mar 12, 1991 | 3,000 | 1,500 | 3,795–3,830 |
MONTHLY INJECTED, BBL · H-10 · LAST 13 REPORTED MONTHS
Last 12 months 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/16930944, documented in the API reference.