WELL · 42-169-33077 · DISTRICT 11

Rattlesnake Creek #1

Plugged

Garza County  · Vertical

Rattlesnake Creek #1 (API 42-169-33077) is a plugged well in Garza County, plugged February 18, 1993, last operated by Renaud Oil Corporation.

The RRC has issued 2 drilling permits between 1991 and 1993, permitted to 3,800 ft.

Operator of record

Renaud Oil Corporation

Midland, TX · P-5 Y, filed Apr 3, 1998 · 12 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitRenaud Oil CorporationJan 25, 1993
3,800
total depth, ft
2
permits on file
Jan 25, 1993
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Feb 18, 1993

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
408223-99ReenterRenaud Oil CorporationJan 19, 1993Jan 25, 1993—3,250
393175-99DrillR K Petroleum CorporationOct 23, 1991Oct 25, 1991—3,800

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
May 1998
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000082558W-14 DisposalCanceled Oct 21, 19982,500100550–650

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0119971998

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16933077, documented in the API reference.