WELL · 42-169-33398 · DISTRICT 8

Thumbs UP A #2

Plugged

Garza County · Rocker -a- NW. (Strawn) field  · Vertical

Thumbs UP A #2 (API 42-169-33398) is a plugged well in Garza County, plugged November 16, 2020, last operated by Raw Oil & Gas Inc..

The RRC has issued 2 drilling permits between 1996 and 2000, permitted to 8,700 ft.

It was permitted by Hat Oil & Gas, Inc. and has since transferred to Raw Oil & Gas Inc. on the wellbore schedule.

Completion filings report 6 formation tops, including San Andres, Spraberry, Dean, Strawn.

Its 2 leases have reported 526K barrels of oil and 253K mcf of gas since October 1995, last reporting in December 2020. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

Raw Oil & Gas Inc.

Permitted by Hat Oil & Gas, Inc.; the EWA schedule now lists a different operator.

Lubbock, TX · P-5 Y, filed Nov 4, 2025 · 148 permits on file · (806) 239-3443

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRaw Oil & Gas Inc.
Production reportsRaw Oil & Gas, Inc.through May 2019
Latest permitHat Oil & Gas, Inc.Aug 7, 2000

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,700
total depth, ft
2
permits on file
Aug 7, 2000
last permit issued
Jul 25, 2000
completed
526K
cumulative oil, bbl
253K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 1995 THROUGH Dec 2020

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 25, 2000
Shut in
—
Plugged
Nov 16, 2020

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Thumbs UP "A" O-11-68211Rocker -a-, NW. (Strawn)Raw Oil & Gas, Inc.1329K222KJul 2000 – Dec 2020
Thumbs UP O-11-67465Hard Hat (Ellenburger)Raw Oil & Gas, Inc.2196K30.6KOct 1995 – Jan 2012

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Hat Oil & Gas, Inc.Nov 1995 → Feb 2002
  2. 2Raw Oil & Gas, Inc.Mar 2002 → May 2019

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
498189-99RecompletionHat Oil & Gas, Inc.Aug 7, 2000Aug 7, 2000Jul 24, 20008,470
453407-99DrillHat Oil & Gas, Inc.Oct 3, 1996Oct 9, 1996Oct 31, 19968,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-67465————
—— O-11-68211————

Formation tops

As filed on W-2/G-1. Subsea from 2,575 ft elevation.Download CSV →

FormationMD ftSubsea
San Andres2,417158
Spraberry4,870-2,295
Dean6,224-3,649
Strawn7,918-5,343
Mississippian8,256-5,681
EllenburgerELLENBERGER8,456-5,881
Ellenburger8,456-5,881

Perforations

Perforated and open-hole intervals.

FromToType
8,0888,094Perforated
8,4568,470Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37513917.5150 S
8.752,60511—
8.6252,60511600 S
5.58,4567.875850 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 10, 2000Aug 9, 2000Yes
00Aug 28, 2000——
00Feb 10, 1997Dec 18, 1996Yes
00Feb 7, 1997——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16933398, documented in the API reference.