WELL · 42-173-31414 · DISTRICT 10

Hirt Lease #1

Plugged

Glasscock County  · Vertical

Hirt Lease #1 (API 42-173-31414) is a plugged well in Glasscock County, plugged December 2, 2010, last operated by Atropos Exploration Company.

The RRC has issued 2 drilling permits between 1983 and 2010, permitted to 11,190 ft.

Operator of record

Atropos Exploration Company

Dallas, TX · P-5 Y, filed Mar 4, 2026 · 56 permits on file · (214) 695-0882

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitAtropos Exploration CompanyAug 30, 2010
11,190
total depth, ft
2
permits on file
Aug 30, 2010
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Dec 2, 2010

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
700148-99ReenterAtropos Exploration CompanyAug 3, 2010Aug 30, 2010Dec 1, 201010,793
193997-99DrillL & B Oil Co. Inc.May 10, 1983May 10, 1983May 11, 198311,190

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/17331414, documented in the API reference.